Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Storage

Bihar Issues Tender for 125 MW Battery Energy Storage Projects

Palak by Palak
March 5, 2025
in Storage
Reading Time: 1 min read
0
Bihar BESS
Share on FacebookShare on TwitterShare on Linkedin

Bihar State Power Generation Company Limited (BSPGCL) has issued a tender for setting up a 125 MW/ 500 MWh standalone battery energy storage system (BESS) with viability gap funding (VGF) support under the build, own, operate, and transfer model. The deadline for bid submission is March 23, 2025. 

According to the tender guidelines, the bidders are required to submit a money deposit of Rs 750,000. Selected developers are required to furnish a performance bank guarantee of Rs 1.85 million per MW. Additionally, they are also required to pay a tender fee of Rs 29,500 and a tender processing fee of Rs 590. The minimum bid capacity is 5 MW/ 20 MWh, while the maximum is 125 MW/ 500 MWh. Successful bidders will receive VGF support of Rs 2.7 million per MWh or 30 per cent of the capital cost, whichever is lower.

RELATED POSTS

Sun Drops Energia signs 120 MW/240 MWh BESPA with GUVNL

Ceigall India secures 150 MW standalone BESS projects in Punjab

The BESS must be connected to the state transmission utility at a minimum voltage level of 33 kV. It will be utilised for charging and discharging based on dispatch instructions from the state load dispatch center in coordination with distribution companies. Only commercially established and operational technologies will be considered to mitigate technology risk and ensure timely commissioning. According to the eligibility criteria, the bidders must have had a minimum annual turnover of Rs 30 million over the last three financial years and must maintain a positive net worth.

Tags: BESSpowerRenewable EnergyStorageTechnologies
ShareTweetShare
Palak

Palak

Related Posts

Sun Drops Energia

Sun Drops Energia signs 120 MW/240 MWh BESPA with GUVNL

by Palak
May 25, 2026
0

Sun Drops Energia Limited, a subsidiary of KPI Green Energy Limited, has signed a battery energy storage purchase agreement (BESPA)...

Ceigall India

Ceigall India secures 150 MW standalone BESS projects in Punjab

by Palak
May 18, 2026
0

Ceigall India Limited has secured two separate orders from Punjab State Power Corporation Limited for development of standalone battery energy...

POWERGRID

POWERGRID Invites Bids for 300 MWh Battery Storage Project

by Palak
May 17, 2026
0

Power Grid Corporation of India Limited (POWERGRID) has invited tender for design, supply, erection, testing and commissioning of a 150...

GE Vernova

GE Vernova secures order for 1.35 GW Upper Sileru pumped storage project

by Palak
May 7, 2026
0

GE Vernova has secured an order from Megha Engineering & Infrastructures Limited (MEIL) to supply nine 150 MW pumped storage...

LPG

India’s LPG Crisis Signals Urgent Energy Infrastructure Push

by Palak
April 28, 2026
0

New Delhi : The ongoing LPG disruption linked to tensions in West Asia has brought renewed attention to India’s energy security,...

Next Post
Renewable Energy Investments

Rajasthan and Telangana Discoms Sign MoU to Boost Renewable Energy Investments

Wind energy

The Future of Offshore Wind Energy: Innovations Driving the Industry Forward

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Joint solar

Joint Solar sharpens focus on TOPCon and higher-efficiency solar modules

June 3, 2026
Shri V. Packirisamy

V. Packirisamy Appointed Director (Commercial) at Power Finance Corporation Limited

June 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • How proper refurbishment can extend life of pre-owned bikes in India?

    0 shares
    Share 0 Tweet 0
  • ACWA Power Signs Landmark $10 Billion Clean Energy Agreements

    0 shares
    Share 0 Tweet 0

Joint Solar sharpens focus on TOPCon and higher-efficiency solar modules

V. Packirisamy Appointed Director (Commercial) at Power Finance Corporation Limited

Sharika Enterprises Limited Enters SCADA-ADMS Market with Uttarakhand Grid Modernization Project

Cargill Launches Two-Year Livestock Development Initiative to Strengthen Maharashtra’s Dairy Sector

Flip Chip Technology Market Witnesses Rising Demand from Consumer Electronics Sector

Servotech Signs ₹400 Crore MoU for Haryana Manufacturing Expansion

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved