Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Storage

JSW Energy Secures 125 MW BESS Project in Latest Auction

Palak by Palak
February 28, 2025
in Storage
Reading Time: 1 min read
0
JSW Energy
Share on FacebookShare on TwitterShare on Linkedin

JSW Energy has bagged a 125 MW/ 500 MWh standalone battery energy storage system (BESS) auction in Kerala. The company has won project from the Solar Energy Corporation of India (SECI) at a tariff of Rs 441,000 per MW per month. The project will be linked to the Mylatti 220 kV substation in Kasaragod. JSW Energy will qualify for viability gap funding of Rs 2.7 million per MWh or 30 per cent of the project’s capital cost, whichever is lower.

The project is required to be commissioned within 15 months of signing the battery energy storage purchase agreement. The project can be implemented in three phases, starting with an initial phase covering 50 per cent of the MWh capacity, followed by up to two additional phases. In order to minimise technological uncertainties, only commercially proven and operational technologies are allowed for implementation.

RELATED POSTS

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Pace Digitek Wins EPC Contract for 250 MW BESS Project from NLC India

Tags: BESSJSW EnergysolarStorageTechnologies
ShareTweetShare
Palak

Palak

Related Posts

Battery Storage

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

by Palak
August 3, 2026
0

Pace Digitek Limited has secured an engineering, procurement, and construction (EPC) contract from NLC India Limited for the development of...

Energy Storage

Pace Digitek Wins EPC Contract for 250 MW BESS Project from NLC India

by Palak
July 31, 2026
0

Pace Digitek Limited has signed an engineering, procurement, and construction (EPC) contract with NLC India Limited for the development of...

Waaree Renewable

Waaree Renewable signs ECI agreement for solar-BESS project in New Zealand

by Palak
July 30, 2026
0

Waaree Renewable Technologies Limited has signed an early contractor involvement (ECI) agreement with the special purpose vehicle of a leading...

Sodium-ion Battery Market

Sodium-ion Battery Market Outlook 2026–2034: Energy Storage Investments Drive Growth

by Palak
July 28, 2026
0

The global sodium-ion battery market is charging toward a new era of affordable, sodium-abundant energy storage — and the numbers...

Cypress Creek Renewables and Google Break

Cypress Creek Renewables and Google Break Ground on 2.5 GW Solar-Plus-Storage Project in the U.S.

by Palak
July 16, 2026
0

Cypress Creek Energy and Google have commenced construction of the first two phases of the Steel River Energy Center in...

Next Post
Jakson Engineers

Jakson Engineers Supplies 100 MW Solar Modules to GIPCL

BOOM Power

BOOM Power Partners with Topsun for Solar Farm Co-Investment in the UK

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved