Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable

India’s Renewable Energy Milestones: MNRE’s Latest Update

Palak by Palak
February 10, 2025
in Renewable
Reading Time: 2 mins read
0
Renewable India
Share on FacebookShare on TwitterShare on Linkedin

The Ministry of New and Renewable Energy has provided an update of India’s renewable energy sector in recent press releases. As of January 2025, the country’s non-fossil fuel energy capacity has reached 217.62 GW. The wind power sector has grown significantly, reaching an installed capacity of 48.16 GW, driven by initiatives like the Centralized Data Collection and Coordination (CCDC) Wind Initiative, which has enhanced wind resource mapping and contributed to over 10 GW of new capacity between 2020 and 2024. Further, in this space, in 2024, the government approved a Rs 74.53 billion Viability Gap Funding scheme to develop India’s first offshore wind energy projects, including 1 GW of capacity off the coasts of Gujarat and Tamil Nadu.

Solar energy has seen rapid growth under the National Solar Mission. India’s solar power sector has witnessed an extraordinary 3,450 per cent increase in capacity over the past decade, rising from 2.82 GW in 2014 to 100 GW in 2025. As of January 31, 2025, India’s total installed solar capacity stands at 100.33 GW, with 84.10 GW under implementation and an additional 47.49 GW under tendering. Solar energy remains the dominant contributor to India’s renewable energy growth, accounting for 47 per cent of the total installed renewable energy capacity. In 2024, a record-breaking 24.5 GW of solar capacity was added, reflecting a more than two-fold increase in solar installations compared to 2023. 2024 also saw the installation of 18.5 GW of utility-scale solar capacity, a nearly 2.8 times increase compared to 2023. Rajasthan, Gujarat, Tamil Nadu, Maharashtra, and Madhya Pradesh are among the top-performing states, contributing significantly to India’s total utility-scale solar installations.

RELATED POSTS

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

NIRL Secures LoI for 900 MW Solar Project from GUVNL

The rooftop solar capacity has increased from 90.8 MW in 2016 to 11,503 MW by 2024, while the number of solar parks has risen from 34 in 2016 to 58 in 2024, doubling their total capacity to 40 GW. The country’s hybrid and round-the-clock (RTC) renewable energy projects are also advancing rapidly, with 64.67 GW under implementation and tendered, bringing the grand total of solar and hybrid projects to 296.59 GW. Other renewable energy sources have also progressed. Small hydro power capacity has reached 5.10 GW, and biomass cogeneration, including both bagasse and non-bagasse, now stands at a combined 10.72 GW. Waste-to-energy initiatives have resulted in a cumulative installed capacity of 619.94 MW.

The National Green Hydrogen Mission, launched in 2023, is positioning India as a global leader in green hydrogen production, attracting investments exceeding Rs 8 trillion. The initiative aims to establish a hydrogen-based economy with a production target of 5 million metric tons by 2030, creating 6,00,000 jobs. By 2024, tenders had been awarded for 412,000 tonnes of annual green hydrogen production, and a 50 per cent subsidy was introduced for electrolyser manufacturing.

Tags: CCDCMNREpowerRenewable Energysolar
ShareTweetShare
Palak

Palak

Related Posts

278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

by Palak
August 3, 2026
0

Bluebird Solar has announced a significant milestone by securing a 278 MW solar PV module supply order from Bridge &...

GUVNL

NIRL Secures LoI for 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited (NIRL), a wholly-owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

Brookfield

Brookfield Launches Renewable Energy Platform Lumara

by Palak
August 3, 2026
0

Brookfield has launched Lumara, a new renewable energy platform focused on accelerating the development and construction of renewable energy projects....

NLC India

NLC India Renewables Wins 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited, a wholly owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

Tata Power

Tata Power begins construction of 800 MW renewable energy project in Andhra Pradesh

by Palak
August 3, 2026
0

Tata Power Renewable Energy Limited (TPREL), a subsidiary of Tata Power, has conducted the groundbreaking ceremony for its 800 MW...

Next Post
Luminous Power Technologies

Luminous Power Technologies Unveils New Manufacturing Facility in Haridwar

BHEL

BHEL Wins LoI for Renewable Energy Transmission in Rajasthan and Uttar Pradesh

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved