Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Batteries
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Batteries
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Amara Raja Infra Secures SECI’s BoS Contract for 300 MW Solar Project

Urja Daily by Urja Daily
February 3, 2025
in Solar
Reading Time: 1 min read
0
Amara Raja Infra
Share on FacebookShare on TwitterShare on Linkedin

Amara Raja Infra Private Limited (ARIPL), a subsidiary of battery manufacturer Amara Raja, has won the Solar Energy Corporation of India’s (SECI) auction to supply the balance of systems (BoS) for a 300 MW grid-connected solar power project at Ramagiri, Andhra Pradesh. The tender was issued in March 2024.

The scope of work includes designing, engineering, procuring, constructing, and commissioning the project, along with five years of comprehensive operation and maintenance. However, the contract does not cover solar modules, which SECI will supply. The project is required to be completed within 18 months. The project contract is valued at Rs 5.44 billion.

RELATED POSTS

Jakson Group Hosts Sri Lanka and Maldives Officials for Solar Partnership Talks

Goldi Solar Unveils World’s Largest Solar Module to Commemorate PM Modi’s 75th Birthday

The contractor will be responsible for inspecting all solar modules supplied by SECI at the site and must provide the necessary test and guarantee certificates for material and equipment performance. The 300 MW project is part of the Central Public Sector Undertaking Scheme Phase II, which aims to develop 12,000 MW of grid-connected solar projects across India. These projects are eligible for the viability gap funding.

Tags: Amara raja InfraSECI
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Jakson Plant

Jakson Group Hosts Sri Lanka and Maldives Officials for Solar Partnership Talks

by Palak
September 24, 2025
0

Delhi NCR, India : The Hon’ble (Eng.) Kumara Jayakody, Minister of Energy, Government of Sri Lanka and Mr. Muaviyath Mohamed, Minister...

Goldi Solar

Goldi Solar Unveils World’s Largest Solar Module to Commemorate PM Modi’s 75th Birthday

by Palak
September 22, 2025
0

Surat, Gujarat, India - In a grand gesture marking the 75th birthday of the Hon’ble Prime Minister Shri Narendra Modi,...

Servotech Renewable Power System Ltd.

Servotech Renewable Power System Ltd. Bags 1.2 MW Rooftop Solar Project from Northern Railway Moradabad Division

by Palak
September 18, 2025
0

New Delhi : Servotech Renewable Power System Ltd. is proud to announce that it has bagged a 1.2 MW grid-connected...

Vikram Solar

Vikram Solar to Supply 200 MW of High-Efficiency Modules to AB Energia

by Palak
September 15, 2025
0

Kolkata – Vikram Solar has announced a major order of 200 MW high-efficiency solar modules from AB Energia, a specialist in end-to-end EPC...

United Capital Infrastructure Fund (UCIF) and Husk Power System

UCIF and Husk Launch Pioneering Local Currency Debt Facility to Expand Solar Minigrids in Nigeria

by Palak
September 11, 2025
0

ABUJA — United Capital Infrastructure Fund (UCIF) has announced the signing of a ₦5 billion (approximately $3.2 million) revolving, local...

Next Post
Bladeless Wind Turbines

Bladeless Wind Turbines: Revolutionizing the Renewable Energy Industry

FR Singhvi

ASDC Welcomes Union Budget 2025-26

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

BPCL

BPCL Kochi Refinery Celebrates 60 Years, Charts Sustainable Path Forward

September 29, 2025
Montra Electric

Montra Electric Unveils Rhino 5538 EV & New Automated Battery Facility

September 29, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

BPCL Kochi Refinery Celebrates 60 Years, Charts Sustainable Path Forward

Montra Electric Unveils Rhino 5538 EV & New Automated Battery Facility

VinFast Expands into Hyderabad with Dual Showroom Launch

India Can Lead in Semiconductor Innovation, If We Skill Right

Samsung and Videotex Partner to Expand Tizen OS TVs in India

Mitsubishi Electric Launches KEGMIL to Streamline Elevator and Escalator Service Management

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Batteries
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved