Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

NHPC Announces Results of 1.2 GW Solar-Plus-Storage Auction

Urja Daily by Urja Daily
January 24, 2025
in Solar
Reading Time: 2 mins read
0
NHPC
Share on FacebookShare on TwitterShare on Linkedin

Onix Renewable, Jindal India Renewable Energy, NTPC Renewable Energy, Kolar Solar Power (Rays Power Infra), ReNew Solar Power, and Adani Renewable Energy Holding Nine (Adani Green Energy Limited) have secured NHPC Limited’s auction to develop 1,200 MW inter-state transmission system (ISTS) connected solar power projects, incorporating 600 MW/1,200 MWh energy storage systems (ESS). 

Onix, Jindal, NTPC, and Kolar were awarded capacities of 100 MW, 180 MW, 300 MW, and 150 MW, respectively, at a tariff of Rs 3.09 per kWh. ReNew Solar Power and Adani Renewable Energy Holding Nine were allocated 300 MW and 170 MW, respectively, at a tariff of Rs 3.10 per kWh. The tender  was floated in September 2024, and the projects are to be completed within 24 to 30 months from signing the power purchase agreement (PPA).

RELATED POSTS

Solar and Wind Outpace Coal and Nuclear in Power Generation

Jakson Engineers to Invest ₹8,000+ Crore in 6 GW Integrated Solar Manufacturing Facility in Madhya Pradesh

The solar power projects are to be implemented on a build-own-operate basis, with a minimum project size requirement of 50 MW, including an ESS component of at least 25 MW/50 MWh, in multiples of 10 MW. The total capacity must not exceed 600 MW (with a minimum ESS component of 300 MW/600 MWh) without the greenshoe option and 1,200 MW with the greenshoe option. For projects in the northeastern and Special Category states, the minimum capacity can be 30 MW, with an ESS component of 15 MW/30 MWh.

NHPC will purchase and sell the generated solar power to state utilities and other entities, with an ESS of at least 0.5 MW/1 MWh required for each 1 MW of contracted capacity. NHPC will enter into a 25-year PPA with the selected bidders, who must quote a single tariff for the entire project capacity. The projects are technology-agnostic, allowing the use of crystalline silicon, thin film, or concentrated photovoltaic modules, with or without trackers.

The projects must maintain a minimum capacity utilisation factor (CUF) within 10 per cent and -15 per cent of the declared value for the first ten years after commercial operation for non-peak power supply. For the remaining duration of the PPA, the CUF must remain within 10 per cent and -20 per cent of the declared annual value. Additionally, no central financial assistance will be provided for implementing these projects.

Tags: JindalKolarNHPCOnixsolarStorage
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Solar and Wind

Solar and Wind Outpace Coal and Nuclear in Power Generation

by Palak
August 28, 2025
0

Washington DC – A review by the SUN DAY Campaign of data just released by the U.S. Energy Information Administration (EIA)...

Jakson Engineers

Jakson Engineers to Invest ₹8,000+ Crore in 6 GW Integrated Solar Manufacturing Facility in Madhya Pradesh

by Palak
August 26, 2025
0

New Delhi : Jakson Engineers Limited is investing over ₹8,000 crore to establish a 6 GW Integrated Solar Module, Cell &...

Jupiter

Jupiter International to set up solar manufacturing facility in Maharashtra

by Palak
August 26, 2025
0

Jupiter International Limited has inked a MoU with the Maharashtra government to establish a vertically integrated solar manufacturing facility at...

Oriana Power

Oriana Power Inks Deal for Solar-Plus-Storage Project

by Palak
August 22, 2025
0

Oriana Power has signed an agreement to develop a 75 MW solar power plant integrated with a 111.57 MWh battery...

Jupiter International

Jupiter International to Set Up Integrated Solar Manufacturing Facility in Maharashtra Under MoU

by Palak
August 22, 2025
0

Jupiter International Limited has signed a memorandum of understanding (MoU) with the Maharashtra government to establish a vertically integrated solar...

Next Post
Avaada

Avaada Secures $1B for Renewables

Saatvik

Saatvik Wins 23 MW Solar EPC Projects in Himachal

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

VinFast

VinFast Rides on India’s Urban Growth for Expansion

August 28, 2025
Absorption Chillers Market

Technological Innovations Driving the Future of Absorption Chillers

August 28, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

VinFast Rides on India’s Urban Growth for Expansion

Technological Innovations Driving the Future of Absorption Chillers

Solar and Wind Outpace Coal and Nuclear in Power Generation

Key Challenges Hindering Growth of the Waterjet Cutting Machines Market

Jakson Engineers to Invest ₹8,000+ Crore in 6 GW Integrated Solar Manufacturing Facility in Madhya Pradesh

ACME Emerges Winner Again in SECI’s Green Ammonia Auction

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved