Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

ITI Limited Announces Tender for 500 MW Solar PV Manufacturing Facility

Urja Daily by Urja Daily
January 8, 2025
in Solar
Reading Time: 2 mins read
0
ITI Limited
Share on FacebookShare on TwitterShare on Linkedin

ITI Limited, a public sector entity under the Department of Telecommunication, has announced a tender for establishing a 500 MW fully-automatic solar photovoltaic (SPV) module manufacturing line on a turnkey basis at its Prayagraj facility in Uttar Pradesh. The tender submission deadline is January 23, 2024.

The project includes the supply, installation, and commissioning of the facility, process optimisation, and a minimum five-year warranty. It also covers layout design and training for the operations and maintenance of the manufacturing line. The initial phase involves setting up a 250 MW fully automatic SPV manufacturing line, with the potential to expand it to 500 MW in the future. Upgrading the existing 18 MW semi-automatic SPV manufacturing line to a 50 MW fully automatic line is also a scope of work under the tender. This upgrade will also involve supply, installation, commissioning, process optimisation, and a minimum two-year warranty, alongside layout design and operator training. The estimated project cost is Rs 650 million.

RELATED POSTS

Joint Solar sharpens focus on TOPCon and higher-efficiency solar modules

Servotech Launches Solar Campaign Featuring Sonu Sood

According to the tender guidelines, the bidders must submit an earnest money deposit of Rs 13 million. The selected bidders are required to deliver, install, and commission one set within seven months from the purchase order date. Bidders must supply three sets of toolboxes and ensure the continuous presence of a maintenance official on a 24-hour basis for five years. The trial run must achieve a production minimum of 500 kW of SPV modules, with the solar cell breakage rate across the line not exceeding 0.2 per cent. Additionally, bidders must provide golden solar cells for testing and calibration purposes, along with laboratory certification for the calibration of the solar cell tester. Payment terms include 50 per cent payment against supply, 40 per cent upon installation and commissioning, and 10 per cent against a performance bank guarantee, all processed through an irrevocable letter of credit with a usance period of 90 days. Preference will be given to Class 1 local suppliers under the public procurement (preference to Make in India) Order 2017. Class 1 suppliers must ensure at least 50 per cent local content, while Class 2 suppliers must provide a minimum of 20 per cent.

According to the eligibility criteria, the bidders are required to have completed similar projects within India in the last five years, meeting one of the following thresholds: three projects of at least 200 MW each, two projects of 250 MW each, or one project of 400 MW. Bidders must also demonstrate a positive net worth for the previous financial year, verified through an auditor’s certificate, and a minimum average annual turnover of Rs 200 million over the last three financial years.

Tags: ITI Limitedsolar
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Joint solar

Joint Solar sharpens focus on TOPCon and higher-efficiency solar modules

by Palak
June 3, 2026
0

New Delhi : Joint Solar is expanding its manufacturing of TOPCon and higher-efficiency solar modules. In view of the growing demand...

Servotech Power Systems

Servotech Launches Solar Campaign Featuring Sonu Sood

by Palak
June 2, 2026
0

New Delhi : Servotech Renewable Power System Ltd. has launched its new Solar TVC ad campaign, ‘Raho Roshan, Bina Tension’,...

Koraam

Koraam Wins Fourth Solar Pumping Systems Order from MSEDCL

by Palak
June 1, 2026
0

Koraam, powered by Kosol Energie Pvt. Ltd., a Grade-A Top Tier-1 Global Solar Manufacturer and a leading solar EPC and...

RSA

Rajasthan Solar Association Leads Industry Dialogue on ALCM 2026, Urges Balanced Policy Framework

by Palak
May 26, 2026
0

Jaipur : Rajasthan Solar Association (RSA) today successfully hosted a high-impact webinar titled “ALCM 2026: Balancing Policy Preparedness and Growth for India’s...

SECI

SECI Launches Tender for Grid-Connected Rooftop Solar PV Systems

by Palak
May 25, 2026
0

The Solar Energy Corporation of India Limited (SECI) has floated a tender to select solar project developers for the development...

Next Post
Energy Storage Systems

Energy Storage Systems: Unlocking Smart Grids and Renewable Integration

Solidus Techno Power

Solidus Techno Power Unveils 110 MWp Solar Project for Jogindra Group in Punjab

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Joint solar

Joint Solar sharpens focus on TOPCon and higher-efficiency solar modules

June 3, 2026
Shri V. Packirisamy

V. Packirisamy Appointed Director (Commercial) at Power Finance Corporation Limited

June 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • How proper refurbishment can extend life of pre-owned bikes in India?

    0 shares
    Share 0 Tweet 0
  • ACWA Power Signs Landmark $10 Billion Clean Energy Agreements

    0 shares
    Share 0 Tweet 0

Joint Solar sharpens focus on TOPCon and higher-efficiency solar modules

V. Packirisamy Appointed Director (Commercial) at Power Finance Corporation Limited

Sharika Enterprises Limited Enters SCADA-ADMS Market with Uttarakhand Grid Modernization Project

Cargill Launches Two-Year Livestock Development Initiative to Strengthen Maharashtra’s Dairy Sector

Flip Chip Technology Market Witnesses Rising Demand from Consumer Electronics Sector

Servotech Signs ₹400 Crore MoU for Haryana Manufacturing Expansion

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved