Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Punjab Genco Issues Tenders for 8 MW Solar Projects

Urja Daily by Urja Daily
December 2, 2024
in Solar
Reading Time: 1 min read
0
Punjab Genco
Share on FacebookShare on TwitterShare on Linkedin

Punjab Genco Limited, under the Punjab Energy Development Agency (PEDA), has issued a tender for two solar power projects of 4 MW each in Bathinda District. The scope includes design, manufacture, supply, erection, and testing, along with operations and maintenance (O&M) for five years. The last date to submit the bids is December 18, 2024.

According to the tender guidelines, the bidders are required to submit a tender fee of Rs 10,000, evaluation charges of Rs 90,000, an earnest money deposit of Rs 1 million via e-payment, and Rs 3 million as a bank guarantee.

RELATED POSTS

KPI Green Bags Solar BoS Order from ABRL

Hindustan Power Signs PPA with UPPCL for 435 MW DC Solar Project

According to the eligibility criteria, the bidders must be manufacturers, system integrators, or EPC firms with experience commissioning at least one solar project of 2 MW and O&M experience for 2 MW over one year in the last five. The bidder’s net worth must be positive for the last financial year, with an average annual turnover of Rs 100 million during the past three financial years. Additionally, projects must ensure a minimum 5 MW DC capacity at the site and export excess power to the grid after stepping up to 11kV.

In May 2023, PEDA issued a tender for 7 MW of grid-connected rooftop and ground-mounted solar installations for government buildings in Punjab and Chandigarh, requiring a Rs 1 million earnest money deposit and a 10 per cent performance bank guarantee from the winning bidder.

Tags: governmentPEDAPunjab Gencosolar
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

KPI Green

KPI Green Bags Solar BoS Order from ABRL

by Palak
August 8, 2025
0

KPI Green Energy Limited (KPI Green), a subsidiary of KPIG Energia Private Limited, has received a letter of award from...

Hindustan Power

Hindustan Power Signs PPA with UPPCL for 435 MW DC Solar Project

by Palak
August 8, 2025
0

Hindustan Power has signed a power purchase agreement (PPA) with Uttar Pradesh Power Corporation Limited (UPPCL) for a 435 MW...

GAIL

GAIL floats EPC tender for floating solar project in Uttar Pradesh

by Palak
August 7, 2025
0

GAIL India Limited (GAIL) has issued an engineering, procurement, and construction (EPC) tender to set up a 17.5 MW (AC)...

Scatec

Scatec Secures Financing for Solar Power Project in Brazil

by Palak
August 7, 2025
0

Scatec ASA has reached financial close for its 142 MW Rio Urucuia solar project currently under construction in Minas Gerais,...

Waaree Energies

Waaree Energies Begins Production at New Manufacturing Facility in Gujarat

by Palak
August 7, 2025
0

Waaree Energies Limited has started production at its 1.8 GW solar module manufacturing facility in Chikhli, Gujarat. The facility increases...

Next Post
EV Charging Infrastructure

MoP Issues Draft Amendment to 2024 Guidelines for EV Charging Infrastructure

DRAIPL Renewable Energy

DRAIPL Secures Projects for 3.5 GW Renewable Energy in Rajasthan

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Mr.Maharana Ray

OPG Mobility Appoints Maharana Ray as President & Chief Growth Officer to Drive Strategic Expansion

August 8, 2025
KPI Green

KPI Green Bags Solar BoS Order from ABRL

August 8, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

OPG Mobility Appoints Maharana Ray as President & Chief Growth Officer to Drive Strategic Expansion

KPI Green Bags Solar BoS Order from ABRL

Hindustan Power Signs PPA with UPPCL for 435 MW DC Solar Project

Energy Vault to Deliver Battery Energy Storage Systems for Projects in Michigan

Italy Launches €15.9 Million Tender to Boost Solar Energy Deployment

EIFO Commits £500 Million Financing for UK Offshore Wind Project

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved