Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Oriana Power Secures Contract for 128 MW Solar Plant Development in Tamil Nadu

Urja Daily by Urja Daily
September 10, 2024
in Solar
Reading Time: 1 min read
0
Oriana Power
Share on FacebookShare on TwitterShare on Linkedin

TrueRE Surya Private Limited, a subsidiary of Oriana Power Limited, has bagged a contract from Dalmia Cement (Bharat) Limited, (DCBL) to build and operate a 128 MW ground-mounted solar power plant in Tamil Nadu. It is being constructed under the open access captive solar segment. The plant will be commenced in a year and is estimated to cost Rs 5.2 billon. It is expected to generate 192 million units of electricity once functional.

In line with the agreement, DBCL will acquire 26 per cent of equity share capital of TrueRE Surya for Rs 448 million in multiple tranches.

RELATED POSTS

Solex Energy Unveils Two Next-Gen High-Efficiency Solar Solutions

Delhi Government Issues Amendments to Solar Energy Policy 2023

In September 2024, Oriana Power received an order of Rs 2.47 billion under engineering, procurement and construction (EPC) segment for setting up a 52 MW ground-mounted solar plant for Bharat Petroleum Corporation Limited in Prayagraj, Uttar Pradesh.  In August 2023, the company bagged an EPC order to establish a 20 MW ground-mounted solar photovoltaic project from Bharat Cooking Coal Limited to be located in Dhanbad, Jharkhand.

Tags: DCBLOriana Powerpowersolar
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Solar Energy

Solex Energy Unveils Two Next-Gen High-Efficiency Solar Solutions

by Palak
July 22, 2025
0

This marks Solex’s focused expansion in Rajasthan, bringing robust, efficient & climate-resilient solar technology to support the region’s growing renewable...

Delhi Government

Delhi Government Issues Amendments to Solar Energy Policy 2023

by Palak
July 21, 2025
0

The Delhi Government has notified the first amendment to its Delhi Solar Energy Policy 2023, raising the subsidy for residential...

Sol Systems

Sol Systems Secures $675 Million for US Solar and Storage Portfolio

by Palak
July 21, 2025
0

Sol Systems has secured $675 million revolving construction finance facility for its solar and storage projects portfolio. The facility will...

MNRE

MNRE Unveils 435 MW Gorbea Solar Power Project in Rajasthan

by Palak
July 21, 2025
0

Ministry of New and Renewable Energy (MNRE) inaugurated the 435 MW Gorbea solar power project as developed by Zelestra India...

WattPower Solar

WattPower, First Solar Host ‘Solar Connect’ to Promote Agri-Solar in Telangana

by Palak
July 18, 2025
0

New Delhi – WattPower hosted a high-level industry roundtable, ‘Solar Connect’, at Vivanta, Hyderabad. The event brought together policy influencers, clean energy...

Next Post
Suzlon Group

Suzlon Group Wins 1,166 MW Wind Energy Contract from NGEL

Indian Renewable Energy Development Agency Limited

IREDA Signs MoU with SJVN and GMR for Hydro Project Collaboration in Nepal

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Wastewater treatment plants

Turn Up the Heat Next Winter with Better Biogas Production!

July 24, 2025
PwC India

PwC India Opens Sixth NCR Office with New Gurugram Facility

July 24, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Turn Up the Heat Next Winter with Better Biogas Production!

PwC India Opens Sixth NCR Office with New Gurugram Facility

Is the World Ready for Driverless Cars? Consumer Sentiment and Self-Driving Cars Market Potential

STMicroelectronics Reports 2025 Second Quarter Financial Results

Key Hurdles Slowing Electric Cargo Bike Adoption

Sharika Enterprises to Automate BMM Ispat Power with SCADA

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved