Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

HPCL Issues Tender for 100 MW Solar Project

editor by editor
May 7, 2024
in Solar
Reading Time: 2 mins read
0
Hindustan Petroleum
Share on FacebookShare on TwitterShare on Linkedin

Hindustan Petroleum Corporation Limited (HPCL) has issued a request for proposals on behalf of its subsidiary, HPCL Renewable & Green Energy. The tender is for an engineering, procurement, and construction package of a 100 MW solar project. To be located at Galiveedu, Annamayya district, Andhra Pradesh, the construction of the plant will take place at around 500 acres of Galiveedu solar park. The responsibility of a bidder includes comprehensive operations and maintenance (O&M) for a period of five years, with a possibility to extend it to additional five years.

According to the tender guidelines, the bidders are required to submit Rs 30.3 million as an earnest money deposit. Central Public Sector Undertakings are not required to make these payments. Within 30 days of receiving the letter of award, the developers are required to furnish 5 per cent of the EPC contract price as a performance bank guarantee. The bid submission deadline is May 17, 2024. The project is expected to be completed within 11 months of receiving the letter of award.

RELATED POSTS

NIRL Secures LoI for 900 MW Solar Project from GUVNL

NLC India Renewables Wins 900 MW Solar Project from GUVNL

To be eligible, the bidders must have completed similar projects within the last seven years. These similar projects must involve the design, engineering, procurement, supply, construction, installation, testing, and commissioning of a ground-mounted solar power project with at least 50 MW capacity on a turnkey basis. Additionally, they should have managed the O&M of the project for at least one year after it became operational. They need to have finished three similar projects, each costing at least Rs 2.25 billion, or two similar projects, each worth at least Rs 2.81 billion. Alternatively, they should have completed at least one similar project with a minimum value of Rs 4.5 billion. The bidders must have also overseen the operation and maintenance of this project for a minimum of one year. Furthermore, HPCL has mandated the use of indigenously manufactured solar modules listed in the Approved List of Models and Manufacturers.

Tags: Hindustan PetroleumHPCLO&Msolar
ShareTweetShare
editor

editor

Related Posts

GUVNL

NIRL Secures LoI for 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited (NIRL), a wholly-owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

NLC India

NLC India Renewables Wins 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited, a wholly owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

SECI

SECI Announces Winners of 4.455 MW Rooftop Solar Auction

by Palak
July 30, 2026
0

The Solar Energy Corporation of India Limited (SECI) has announced the winners for grid-connected rooftop solar project under the renewable...

LNK Energy

LNK Energy Secures Funding for Phase 1 of 6 GW Solar Manufacturing Facility

by Palak
July 30, 2026
0

LNK Energy has secured financial closure for phase 1 of its 6 GW integrated solar manufacturing facility in Maharashtra through...

Shweta Solar

Shweta Solar champions dependable after-sales support in rooftop solar

by Palak
July 27, 2026
0

New Delhi : Installing a rooftop solar system is only the beginning of a much longer journey. As more households...

Next Post
Juniper Green Energy

Juniper Green Energy inks PPA to set up 1GW RE Capacity

Juniper Green

Juniper Green signs PPA with SJVN to develop 1,000 MW renewable energy projects

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved