Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

ONGC Board approves JV with EverEnviro to develop CBG plants across India

editor by editor
March 5, 2024
in News
Reading Time: 1 min read
0
ONGC
Share on FacebookShare on TwitterShare on Linkedin

The Oil and Natural Gas Corporation (ONGC) is set to collaborate with EverEnviro Resource Management in establishing compressed biogas plants (CBG) nationwide. ONGC’s board has granted approval for the creation of joint venture (JV) companies with EverEnviro and another entity, aiming to establish 15 CBG plants. Additionally, the board has given preliminary approval for the formation of 50:50 JVs with both entities separately, either directly through ONGC or its subsidiaries associates.

EverEnviro plans to set up more than 100 CBG plants throughout India, utilising various feedstocks such as municipal solid waste, agro waste, and agro-industrial waste. The company is currently implementing over 20 CBG projects in Madhya Pradesh, Uttar Pradesh, Delhi, and Punjab, with a substantial capital investment of almost Rs 20 billion. This investment is expected to yield a robust daily CBG output of 320 metric tons.

RELATED POSTS

World Bank and IAEA Ink Pact to Promote Safe Nuclear Energy in Developing Nations

COMAU Unveils Innovative N-WG Welding Gun at Automatica 2025

Recently, in February 2024, Bajaj Hindustan Sugar Limited and EverEnviro signed MoU to develop CBG plants in Uttar Pradesh. In the same month, EverEnviro Resource Management signed an agreement to produce CBG for city gas distribution networks.

In September 2023, state-owned Indian Oil Corporation Limited formed a 50:50 joint venture with EverEnviro to build additional CBG production capacity nationwide.

Tags: agro wasteBajajCBG plantsEverEnviroInvestmentONGC
ShareTweetShare
editor

editor

Related Posts

World Bank

World Bank and IAEA Ink Pact to Promote Safe Nuclear Energy in Developing Nations

by Palak
June 28, 2025
0

The World Bank has signed a memorandum of understanding with the International Atomic Energy Agency (IAEA) to advance the safe...

COMAU N-WG Welding Gun

COMAU Unveils Innovative N-WG Welding Gun at Automatica 2025

by Palak
June 27, 2025
0

Comau’s patented, modular solution is designed to reduce total cost of ownership through improved efficiency and lower operating costs The...

JSW Ventures

StayVista Raises Over INR 40 Cr in Funding Round Led by JSW Ventures

by Palak
June 27, 2025
0

Mumbai (India) : StayVista has raised over INR 40 Cr in Series B funding, led by JSW Ventures, with participation...

EIA Data

EIA Data Reveals Record-Breaking Renewable Energy Generation in April

by Palak
June 27, 2025
0

Washington DC – A review by the SUN DAY Campaign of data just released by the U.S. Energy Information Administration (EIA)...

Sustain Labs Paris

Sustain Labs Paris Unveils 2025 Climate Leaders Cohort with 47% Indian Representation

by Palak
June 27, 2025
0

Delhi : Sustain Labs Paris (SLP), the world’s largest sustainability-focused venture builder, has unveiled the 2025 cohort of its prestigious Climate...

Next Post
Rightcharge

Rightcharge partners with Mercedes-Benz Vans in UK to ease businesses' transition to electric

K.P. Energy

K.P. Energy commissions 25.2 MW wind project

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Electric Vehicle Market

Electric Vehicle Market

June 30, 2025
LEAP24

LEAP24 Speeds Up London EV Charging Expansion with Four New Ultra-Rapid Sites in One Week

June 30, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Electric Vehicle Market

LEAP24 Speeds Up London EV Charging Expansion with Four New Ultra-Rapid Sites in One Week

Eurowind Energy Invests €174.8 Million to Develop 220 MW Solar Park in Romania

Egypt’s AMEA Power Achieves Financial Closure for 300 MWh BESS Project

Arevon Begins Operations of 200 MW Energy Storage Project in San Diego

Cummins India Launches Battery Energy Storage System to Support Clean Energy Transition

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved