Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Power

Torrent Power and Lanco emerge lowest bidders in natural gas-fired power auction

editor by editor
February 26, 2024
in Power
Reading Time: 1 min read
0
Torrent Power
Share on FacebookShare on TwitterShare on Linkedin

Torrent Power and Lanco Group have emerged as the lowest bidder in an auction for supplying natural gas-fired power during peak electricity demand periods.

Initiated by NTPC Limited in January 2024, the tender sought 4,000 MW of gas-fired power but only received bids totaling 1,307 MW.  Torrent Power’s DGEN Power plant in Gujarat has proposed to supply 770 MW of power at Rs 5.63 per kWh, while Lanco’s gas-fired plant has offered 355 MW at Rs 7.02 per kWh. Additionally, two smaller plants in Uttarakhand have offered a combined 182 MW at an average rate of over Rs 7 per kWh. Although these companies have emerged as the lowest bidders in the online auction, the awarding of contracts is pending.

RELATED POSTS

RECPDCL transfers Vikramshila Power Transmission SPV to AESL

AESL Wins Bihar Transmission Project to Facilitate Power Evacuation from 2,400 MW Pirpainti Plant

Tags: gas-firedGujaratLanco GroupPower PlantTorrent Power
ShareTweetShare
editor

editor

Related Posts

RECPDCL

RECPDCL transfers Vikramshila Power Transmission SPV to AESL

by Palak
November 23, 2026
0

REC Power Development and Consultancy Limited (RECPDCL) has transferred Vikramshila Power Transmission Limited, a project-specific special purpose vehicle (SPV) for...

Power

AESL Wins Bihar Transmission Project to Facilitate Power Evacuation from 2,400 MW Pirpainti Plant

by Palak
November 21, 2026
0

Adani Energy Solutions Limited (AESL) has secured a transmission project for evacuating power from the upcoming 2,400 MW Pirpainti thermal...

Oriana Power

TrueRE Oriana Power to Set up Five CBG Projects Across Three States with 110 TPD Capacity; to Invest Rs. 750 Crores

by Palak
November 20, 2026
0

New Delhi, Delhi, India - TrueRE Oriana Power Limited, listed on NSE Emerge, and one of India’s leading integrated renewable...

Power

Nepal to import 350 MW of electricity from India until July 2027

by Palak
November 19, 2026
0

Nepal has secured approval to procure up to 350 MW of electricity from India between November 17, 2026 and July...

Power

Thermal Management & Reliability Testing in High-Power/High-Speed Boards

by Palak
November 18, 2026
0

As electronics move toward higher processing speeds, greater power density and increasingly compact form factors, thermal management and reliability testing...

Next Post
CERC directs power

CERC directs power exchanges to conduct comprehensive audit

India's Largest Solar-Battery

SECI Unveils India's Largest Solar-Battery Project in Chhattisgarh

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Juniper Green Energy

Juniper Green Energy Commissions 109 MWp Solar and 95 MWh Battery Storage Capacity

November 23, 2026
RECPDCL

RECPDCL transfers Vikramshila Power Transmission SPV to AESL

November 23, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Juniper Green Energy Commissions 109 MWp Solar and 95 MWh Battery Storage Capacity

RECPDCL transfers Vikramshila Power Transmission SPV to AESL

Bihar Signs ₹1.72 Trillion MoUs for Nuclear Power and Pumped Storage Projects

Waaree Transpower Bags Transformer Order Worth Over Rs 100 Crore from NTPC

AESL Wins Bihar Transmission Project to Facilitate Power Evacuation from 2,400 MW Pirpainti Plant

VAML Accelerates Low-Carbon Transition with 63% Rise in Renewable Energy Use

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved