Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

Shanghai Electric’s Solar Thermal Trough Unit No. 1 Project in Dubai

Urja Daily by Urja Daily
November 30, 2022
in News
Reading Time: 2 mins read
0
Solar Thermal
Share on FacebookShare on TwitterShare on Linkedin

SHANGHAI : On November 29 (Dubai Time), the Trough Unit No. 1 facility of Shanghai Electric‘s 700MW solar thermal and 250MW photovoltaic solar power plant in Dubai has successfully achieved grid-connected electricity generation, marking a significant milestone along the path of the firm’s entry into the renewable energy sector. The facility is already delivering top-notch technical parameters and reliable operation of both the primary and auxiliary equipment, supplying environmentally friendly solar thermal energy to local communities for the first time.

The project, for which Shanghai Electric Group is the contractor, is the fourth phase of the solar thermal and PV power plant developed by Dubai Electricity and Water Authority in Mohammed bin Rashid Al Maktoum (MBR) Solar Park. Connection of the facility to the grid marks the completion of a key goal in Shanghai Electric’s globalization roadmap. Built on the world-leading tower and leveraging trough solar thermal power generation technologies, the project overcomes the limitation that conventional PV power stations cannot generate electricity at night, making it a demonstration model for the Chinese government’s Belt and Road initiative and efforts to achieve global carbon neutrality.

RELATED POSTS

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

The 250MW PV modules are dispersed in unused locations to maximize site use, while the 700MW solar thermal facility consists of three 200MW trough units and a 100MW tower unit. It is the largest standalone solar PV project in the world, with an area of 44 square kilometers (approx. 17 sq. miles), the equivalent of just over 6,000 standard soccer fields or 100 Tiananmen Squares. The project utilizes roughly 560,000 tons of molten salt and 70,000 heliostats each measuring roughly 25 square meters. The earthwork required for site leveling in the desert amounted to some 40 million cubic meters, which is equal in volume to 41 ‘Water Cubes’ (the well-known aquatics center at the Olympic Green in Beijing) or to the amount of sand and gravel used to construct two of the artificial islands supporting the Hong Kong-Zhuhai-Macau Bridge. The facility, which rises to a height of 262 meters (approx. 860 feet), is the tallest tower solar thermal project in the world. Additionally, it provides the world’s biggest commercially operating slot opening technology with an opening distance of 8.2 meters. Operation of the facility replaces the burning of 2 million tons of standard coal annually. All of these factors combine to make it the largest solar thermal project in the world in terms of installed capacity, investment size, and molten salt reserve heat.

Its location in the middle of the desert, where daytime temperatures can soar to close to 50°C (122°F), combined with the impact of the pandemic, among other factors, led to the project encountering several difficulties during construction, including rising costs across-the-board (of which costs for raw materials witnessed the steepest increases), delays in shipping, supply chain challenges to the fabrication of equipment and a severe staffing shortage. By adopting creative solutions and being meticulous in advance preparation, the project department overcame several technical issues to achieve this milestone.

The energy stored in the trough units and the tower unit, once all units are operational, can generate power continuously for a maximum of 13.5 hours at night and 15 hours during periods of inclement weather. When the entire project is completed, it will bring Dubai significantly closer to achieving its 2050 Clean Energy goal of supplying clean power to 320,000 local families and reducing carbon emissions by 1.6 million tons annually.

Tags: ElectricityphotovoltaicRenewable EnergyShanghai ElectricsolarSolar Power
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

by Palak
August 3, 2026
0

HONG KONG - Driven by the rapid iteration of global artificial intelligence (AI) large models, the continuous surge in computing demand...

ASDC CEO Prasanna Pahade

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

by Palak
August 3, 2026
0

New Delhi: The Automotive Skills Development Council (ASDC), India's apex skill development body for the automotive sector, today announced the appointment...

Ather Energy

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

by Palak
August 3, 2026
0

National : Ather Energy reported a strong EBITDA improvement of 1,650 basis points (bps) year-on-year (YoY).The company delivered 83,173 units...

PVV Infra

PVV Infra secures land mark sites from NHLML for developing wayside amenities

by Palak
August 3, 2026
0

Hyderabad : PVV Infra Limited has received two prestigious Letters of Award (LOAs) from National Highways Logistics Management Limited (NHLML), a...

Inox Wind

Inox Wind Secures 200 MW Wind Project Order from NLC India

by Palak
July 31, 2026
0

Inox Wind Limited has secured a repeat 200 MW turnkey order from NLC India Limited. The order covers end-to-end project...

Next Post
Inauguration of New BikeWo EV showroom at Ahmedabad

BikeWo showroom opened near Nikol Ring Road Circle Ahmedabad

Hydrogen Vehicle Systems

Hydrogen Vehicle Systems announced £15 million grant from UK Government

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved