100 MW (AC) Solar PV Project Along with 40MW/120 MWh BESS at Rajnandgaon :SECI

0
3442

2nd Pre-Proposal Conference: Selection of Consultancy Firm for Owners Engineer (OE) services for 100 MW (AC) Solar PV Project (160MWp DC capacity) along with 40MW/120 MWh Battery Energy Storage System at district Rajnandgaon, Chhattisgarh, India during Design, Construction, Commissioning and Operations of the facility under Innovations in Solar Power & Hybrid Technologies Project in India

Employer: Solar Energy Corporation of India Limited (SECI), New Delhi, India

Project: Innovation in Solar Power and Hybrid Technologies Project

RfP title: Selection of Consultancy Firm for Owners Engineer (OE) services for 100 MW (AC) Solar PV Project (160MWp DC capacity) along with 40MW/120 MWh Battery Energy Storage System at district Rajnandgaon, Chhattisgarh, India during Design, Construction, Commissioning and Operations of the facility under Innovations in Solar Power & Hybrid Technologies Project in India

RfP No: SECI/C&P/RfP/2020/CG/100/120/OE

Tender Search Code (TSC) for the RfB: SECI-2021-TN0000003

Date of 2nd Pre-Proposal Conference:

The 2nd Pre-Proposal Conference has been scheduled in online mode through Video Conferencing (VC), details of which are given as under:

please join the meeting at 09.07.2021, 14:00 Hours, India Standard Time (UTC+5:30), by clicking on this link:

https://teams.microsoft.com/l/meetup-join/19%3af7db1e6ae3084acfa165c20797e8cf34%40thread.tacv2/1625658044364?context=%7b%22Tid%22%3a%226ba91649-6082-4e2e-861b-ab47c044c9b6%22%2c%22Oid%22%3a%229727fc22-9847-4852-8d36-5e941aa7597c%22%7d

Kindly send across the details of the the Consultant’s team members at sandeeprana@seci.co.in, who wish to participate in the mentioned 2nd Pre-Proposal Conference. Mail confirmation along with the person details may be sent by 08.07.2021, 1800 Hours.

Prospective Bidders are requested to remain updated for any notices wrt the 2nd Pre-Proposal Conference & RfP document through the websites www.seci.co.in and https://www.bharat-electronictender.com as no separate notification will be issued in this regard.

‘Click Here To See Files’

Previous articleSupply of 60KWP Grid Connected Roof Top Model Solar Plant
Next articleArcLight Announced Closing of Renewable Infrastructure Fund

LEAVE A REPLY

Please enter your comment!
Please enter your name here