Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

JinkoSolar Launched New Tiger Pro Modules

Urja Daily by Urja Daily
March 30, 2021
in News
Reading Time: 2 mins read
0
Tiger Pro Modules
Share on FacebookShare on TwitterShare on Linkedin

JinkoSolar has announced that it has launched a new series of ultra-efficient Tiger Pro modules with higher power capacity targeted for distributed generation market. The new module is based on the Tiger Pro 182mm, 54-cell design that delivers a maximum power of 415W and an ultra-high efficiency of 21.3%.

Suitable for a variety of distributed energy resources (DER), the new Tiger Pro modules feature a re-design in terms of size and weight, two of the most important features to fit the height and arm-length of installers, which are also user-friendly for rooftop installation. The new Tiger Pro module is about 1.7 meters in length and 1.1 meters in width, making the design a better fit to meet market demands in terms of installation, manual handling, and transportation compared with conventional modules. High quality modules are always accompanied by reliable warranty and JinkoSolar’s Tiger Pro Series offers the industry’s outstanding 15-year product warranty and 25-year linear warranty. The degradation is 2% in the first year, and the maximum annual degradation is 0.55% from the second year to the 25th year. With upgraded module materials and optimized process design, Tiger Pro modules provide superior mechanical load safety and reliability under extreme weather conditions. Excellent mechanical load performance makes the modules suitable for installation in high snow/wind load areas.

RELATED POSTS

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Thanks to its improved size design, higher module power and higher conversion efficiency, the Tiger Pro Modules Series can provide customers with lower LCOE and long-term reliable power generation for a wide variety of distributed scenarios, from industrial and commercial rooftops to residential needs. The Tiger Pro modules continue to meet the needs of most residential customers with its small size and elegant appearance, and is expected to become the best choice for high efficiency PV modules in the residential market.

Mr. Kangping Chen, Chief Executive Officer of JinkoSolar Co., Ltd., commented, “JinkoSolar has continued to dominate the global industry through its efforts in R&D, iterative innovation, reliable production and quality as well as outstanding customer service. JinkoSolar will continue to maintain its leading position worldwide, strengthen innovation and cooperation with our global partners, as well as promote carbon neutrality through green transformation and renewable energy solutions for our global customers”.

Tags: JinkoSolarTiger Pro Modules
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

by Palak
August 3, 2026
0

HONG KONG - Driven by the rapid iteration of global artificial intelligence (AI) large models, the continuous surge in computing demand...

ASDC CEO Prasanna Pahade

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

by Palak
August 3, 2026
0

New Delhi: The Automotive Skills Development Council (ASDC), India's apex skill development body for the automotive sector, today announced the appointment...

Ather Energy

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

by Palak
August 3, 2026
0

National : Ather Energy reported a strong EBITDA improvement of 1,650 basis points (bps) year-on-year (YoY).The company delivered 83,173 units...

PVV Infra

PVV Infra secures land mark sites from NHLML for developing wayside amenities

by Palak
August 3, 2026
0

Hyderabad : PVV Infra Limited has received two prestigious Letters of Award (LOAs) from National Highways Logistics Management Limited (NHLML), a...

Inox Wind

Inox Wind Secures 200 MW Wind Project Order from NLC India

by Palak
July 31, 2026
0

Inox Wind Limited has secured a repeat 200 MW turnkey order from NLC India Limited. The order covers end-to-end project...

Next Post
DeepBlue 3.0 Light Tailored

JA Solar Launched DeepBlue 3.0 Light Module Tailored

FIMER

FIMER Introduced Inverters with SwitchDin’s Technology

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved