Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Storage

Vistra Brings World’s Largest Utility-Scale Battery Energy Storage System Online

Urja Daily by Urja Daily
January 9, 2021
in Storage
Reading Time: 3 mins read
0
Vistra Brings World’s Largest Utility-Scale Battery Energy Storage System Online
Share on FacebookShare on TwitterShare on Linkedin

Vistra has announced that its Moss Landing Energy Storage Facility connected to the power grid and began operating on Dec. 11, 2020. At 300 megawatts/1,200 megawatt-hours, the lithium-ion battery storage system, located on-site at Vistra’s Moss Landing Power Plant in Monterey County, California, will be the largest of its kind in the world. Furthermore, construction is already underway on Phase II, which will add an additional 100 MW/400 MWh to the facility by August 2021, bringing its total capacity to 400 MW/1,600 MWh.

“This is a keystone project and it is important in so many ways – it revitalizes an existing power plant site and utilizes active transmission lines, enhances grid stability, fills the reliability gap created by intermittent renewables, provides emission-free electricity, supports California’s sustainability goals and mandates, significantly benefits the local community, and ultimately provides affordable electricity to consumers,” said Curt Morgan, chief executive officer of Vistra. “A battery system of this size and scale has never been built before. As our country transitions to a clean energy future, batteries will play a pivotal role and the Vistra Moss Landing project will serve as the model for utility-scale battery storage for years to come.”  

RELATED POSTS

Sun Drops Energia signs 120 MW/240 MWh BESPA with GUVNL

Ceigall India secures 150 MW standalone BESS projects in Punjab

Housed inside the power plant’s completely refurbished former turbine building and spanning the length of nearly three football fields, Phase I of the battery system can power approximately 225,000 homes during peak electricity pricing periods. The system is made up of more than 4,500 stacked battery racks or cabinets, each containing 22 individual battery modules, which capture excess electricity from the grid, largely during high solar-output hours, and can release the power when energy demand is at its highest and solar electricity is declining, usually early morning and late afternoon.

Phases I and II of the Vistra Moss Landing Energy Storage Facility are backed up by long-term resource adequacy contracts with Pacific Gas and Electric Company (PG&E).

“We appreciate the strong working relationship we’ve developed with PG&E on multiple projects and look forward to continuing to help meet its resource adequacy requirements and provide clean, reliable, and affordable power to Californians,” Morgan said.

Vistra’s Moss Landing site provides a unique opportunity for extensive future expansion of the battery storage system. With its existing infrastructure and the physical space for potential growth, this world-class industrial-zoned site can support up to 1,500 MW/6,000 MWh of storage capacity should market and economic conditions support it. With the development permit already in place and the site in condition for expansion, Vistra will be able to move quickly when that time comes.

Vistra is a market leader in utility-scale battery energy storage development and commercialization. Its Moss Landing project is the flagship of its 4,000-MW zero-carbon Vistra Zero portfolio, which includes a total of five battery projects in California and Texas:

  • Upton 2 (10 MW/42 MWh) – online December 2018
  • Moss Landing – Phase I (300 MW/1,200 MWh) – online December 2020
  • Moss Landing – Phase II (100 MW/400 MWh) – expected online by August 2021
  • Oakland (36.25 MW/145 MWh) – expected online 2022
  • DeCordova (260 MW/260 MWh) – expected online 2022

Support for Vistra Moss Landing Energy Storage Project

California State Senator John Laird said, “As the largest of its kind in the world, the Vistra Zero Moss Landing Energy Storage Facility will store renewable energy, releasing it when it is needed most. It is meaningful, ambitious projects like these that will help to pave the way to a 100% clean energy future for California and the rest of the world.”

Monterey County Supervisor John M. Phillips said, “When people think about Moss Landing energy, they usually envision the landmark power plant and its two tall smokestacks. In fact, Vistra’s Moss Landing Energy Storage Facility will be the largest battery storage facility of its kind in the world and will provide a tremendous amount of reliable, clean energy. Vistra continues to be an outstanding community partner and reliable steward of the historic Moss Landing Power Plant.”

Tags: Energy Storage System OnlineUtility-Scale Battery'Vistra
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Sun Drops Energia

Sun Drops Energia signs 120 MW/240 MWh BESPA with GUVNL

by Palak
May 25, 2026
0

Sun Drops Energia Limited, a subsidiary of KPI Green Energy Limited, has signed a battery energy storage purchase agreement (BESPA)...

Ceigall India

Ceigall India secures 150 MW standalone BESS projects in Punjab

by Palak
May 18, 2026
0

Ceigall India Limited has secured two separate orders from Punjab State Power Corporation Limited for development of standalone battery energy...

POWERGRID

POWERGRID Invites Bids for 300 MWh Battery Storage Project

by Palak
May 17, 2026
0

Power Grid Corporation of India Limited (POWERGRID) has invited tender for design, supply, erection, testing and commissioning of a 150...

GE Vernova

GE Vernova secures order for 1.35 GW Upper Sileru pumped storage project

by Palak
May 7, 2026
0

GE Vernova has secured an order from Megha Engineering & Infrastructures Limited (MEIL) to supply nine 150 MW pumped storage...

LPG

India’s LPG Crisis Signals Urgent Energy Infrastructure Push

by Palak
April 28, 2026
0

New Delhi : The ongoing LPG disruption linked to tensions in West Asia has brought renewed attention to India’s energy security,...

Next Post
Photovoltaic

ReneSola Power Announces Sale of 12.3 MW of Projects in Hungary

BayWa r.e. Wind Project

Consumers Energy's Gratiot Farms Wind Project Now Producing Power

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Joint solar

Joint Solar sharpens focus on TOPCon and higher-efficiency solar modules

June 3, 2026
Shri V. Packirisamy

V. Packirisamy Appointed Director (Commercial) at Power Finance Corporation Limited

June 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • How proper refurbishment can extend life of pre-owned bikes in India?

    0 shares
    Share 0 Tweet 0
  • ACWA Power Signs Landmark $10 Billion Clean Energy Agreements

    0 shares
    Share 0 Tweet 0

Joint Solar sharpens focus on TOPCon and higher-efficiency solar modules

V. Packirisamy Appointed Director (Commercial) at Power Finance Corporation Limited

Sharika Enterprises Limited Enters SCADA-ADMS Market with Uttarakhand Grid Modernization Project

Cargill Launches Two-Year Livestock Development Initiative to Strengthen Maharashtra’s Dairy Sector

Flip Chip Technology Market Witnesses Rising Demand from Consumer Electronics Sector

Servotech Signs ₹400 Crore MoU for Haryana Manufacturing Expansion

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved