Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Wind

Tamil Nadu Announces Repowering, Refurbishment, and Life Extension Policy 2024 for Wind Energy Generators

Urja Daily by Urja Daily
September 16, 2024
in Wind
Reading Time: 1 min read
0
SECI
Share on FacebookShare on TwitterShare on Linkedin

Tamil Nadu has issued the Repowering, Refurbishment and Life Extension Policy 2024 for wind energy generators (WEG).

All WEGs that have completed their operational life period of 20 years will have to compulsorily opt for a repowering, refurbishment or a life extension project. For other WEGs, participation is voluntary. Further, the repowering, refurbishment, or life extension of state transmission utility connected projects will be implemented through the state nodal agency. For sale of power, if any WEG opts for repowering, they will be allowed 18 months for repowering and one year for refurbishment from the date of approval for execution of repowering and refurbishment respectively.  During the period of repowering or refurbishment of the WEG, they will be allowed to draw power from the grid for project completion. The repowered and refurbished projects can self-consume or sell the excess power generated to other entities at prevailing tariffs.

RELATED POSTS

UK Greenlights 1.5 GW Offshore Wind Project

ACEN Australia Gains Green Light for 900 MW Wind Project

Tags: powerRefurbishmentRepoweringwind energy
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

UK Greenlights

UK Greenlights 1.5 GW Offshore Wind Project

by Palak
September 2, 2025
0

The UK government has approved the Morgan Generation offshore wind farm, located in the Irish Sea. The project will have...

ACEN

ACEN Australia Gains Green Light for 900 MW Wind Project

by Palak
September 1, 2025
0

ACEN Australia’s 900 MW Robbins Island Wind project has received approval from the federal government after more than eight years...

Solar and Wind

Solar and Wind Outpace Coal and Nuclear in Power Generation

by Palak
August 28, 2025
0

Washington DC – A review by the SUN DAY Campaign of data just released by the U.S. Energy Information Administration (EIA)...

Yunlin

Yunlin Offshore Wind Farm Commences Commercial Operations in Taiwan

by Palak
August 26, 2025
0

The Yunlin offshore wind farm of the Yunneng Wind Power Co. Ltd. has started commercial operations with an installed capacity...

Wind Turbins

US Launches Security Investigation into Wind Turbine Imports

by Palak
August 25, 2025
0

The US Department of Commerce has launched a national security investigation into imports of wind turbines and their components under...

Next Post
Genus Power

Genus Power Establishes Two Special Purpose Vehicles (SPVs) for AMISP Services under RDSS

Azure Power

Azure Power Global Plans USD 350 Million Green Bond Prepayment with Rs 24 Billion Term Loan Refinancing

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Mr. Raman Bhatia with Jerry Nie Sino Zhuhai Piwin New Energy Co., Ltd

Servotech Renewable Power Partners with Zhuhai Piwin New Energy in Exclusive Deal

September 8, 2025
Vikram Solar

Vikram Solar Bags 336 MW Module Supply Order from L&T for Khavda Project

September 8, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Servotech Renewable Power Partners with Zhuhai Piwin New Energy in Exclusive Deal

Vikram Solar Bags 336 MW Module Supply Order from L&T for Khavda Project

What Are the Latest Technological Innovations in Fuel Cell Vehicles?

Shweta Solar set to unveil 1.2 GW Advanced Solar Module Manufacturing Facility in NCR

Transmission Lines: Myths, Facts, and Why They Matter for Powering India’s Future

UAE Energy Undersecretary Visits Tellus Power Globe Holding’s Hong Kong Office

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved