Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Sungrow Installed 130 MWp Bagerhat Solar Power Plant

Urja Daily by Urja Daily
December 20, 2021
in Solar
Reading Time: 3 mins read
0
Sungrow
Share on FacebookShare on TwitterShare on Linkedin

KHULNA, Bangladesh – Sungrow has announced recently that Bangladesh’s largest PV project – the 130 MWp Bagerhat solar power plant with Sungrow’s central inverter solutions installed came into commercial operation in late December 2021. Working closely with ABB and Orion Group, Sungrow will offer its expertise and continue to support Bangladesh in its energy transition journey.

With 95% of Bangladesh’s power generation stemming from gas, diesel, and coal, this 130 MWp project is a significant development for a nation that had a total grid-connected capacity of approximately 100 MW in 2020.

RELATED POSTS

Solar Pumps Surge Ahead: Fueling the Future of Sustainable Water Solutions

KPI Green Energy Secures 36.87 MW Captive Solar Projects

Located in Khulna, the Bagerhat project overtook the 73 MW Mymensingh solar power plant as Bangladesh’s largest solar power plant upon its completion. Utilizing Bangladesh’s 2,500 hours of sunshine per year, the project will be able to generate power equivalent to that produced by more than 324,000 tons of coal a year. It is so far the largest eco-friendly power project to provide clean energy by using the most efficient monocrystalline solar panels and over 99% efficient inverters. This plant is connected to 132/33 KV Mongla PGCB Grid Substation through a newly constructed around 9 km transmission line.

Due to Bangladesh’s humid and hot climate, ABB has chosen to deploy Sungrow’s advanced SG3125HV 1500Vdc system for its efficiency and cost-effectiveness. The SG3125HV features temperature-controlled air cooling which allows it to operate without derating even when the temperature is up to 50 degrees Celsius. Moreover, its design allows for investment savings in the form of lower transportation and installation costs.

The investor of this project, Orion Group is a leading conglomerate and a legendary brand name in the business arena of Bangladesh. “We needed a solution that offers the most upside in terms of performance, cost-effectiveness, and compatibility with the conditions of the project. Sungrow, as a pioneer, was able to surpass all of our expectations with their state-of-the-art product,” commented Mehedi Islam Aneek, Project Manager of Orion Group.

Recently, the government of Bangladesh unveiled its renewable energy generation strategy for the Eighth Five-Year Plan period. The government said the new strategy will have to be aggressively pursued so that all that is planned to get implemented in time and the required policy support is prioritized. Citing the significant success of the introduction of rooftop PV systems and the role solar energy has played in providing lighting for homes, the Bangladeshi government said that the Eighth Five-Year Plan will continue to focus on solar and wind power development.

“We are honored and excited to be a part of the first 130 MWp scale solar project in Bangladesh. Bangladesh’s rapid industrialization has led to a drastic demand increase for power generation and the government is more focused on renewable energy development than ever before. With our experience and expertise, Sungrow is ready to expand our footprint in this growing market and assist Bangladesh in reaching its renewable power generation targets and beyond,” said Hu Yukun, Regional Manager, South Asia of Sungrow.

For more information, please visit www.sungrowpower.com.

Tags: inverter solutionPGCB GridSolar Panelssolar power plantSungrow
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Solar Pumps

Solar Pumps Surge Ahead: Fueling the Future of Sustainable Water Solutions

by Palak
June 25, 2025
0

As the world embraces clean and renewable energy sources, solar-powered technologies are stepping into the spotlight like never before. Among...

KPI Green Energy

KPI Green Energy Secures 36.87 MW Captive Solar Projects

by Palak
June 21, 2025
0

KPI Green Energy Limited’s wholly owned subsidiary Sun Drops Energia has secured new orders for 36.87 MW of captive solar...

Juniper Green Energy

Juniper Green Energy Commissions 59 MWp Solar Project in Wardha, Maharashtra

by Palak
June 21, 2025
0

Juniper Green Energy has commissioned the 59 MWp/42 MW solar component of its 75 MW hybrid power project in Karanja...

Servotech Renewable x Rhine Solar

Servotech Acquires 27% Stake in Rhine Solar to Strengthen Solar Manufacturing Portfolio

by Palak
June 20, 2025
0

New Delhi : Servotech Renewable Power System Ltd. has officially entered into a definitive agreement to acquire a 27% stake (Post-money...

Delta Electronics

Delta Electronics Wins 1 GW Solar Inverter Supply Order from KP Group

by Palak
June 20, 2025
0

Delta Electronics India has secured an order from KP Group to supply approximately 1 GW of solar photovoltaic inverters. The...

Next Post
WAAREE Energies

WAAREE Supplied 2.4 MW of Solar Modules to Kochi Metro Rail

Eco Innovation Group

Eco Innovation Group Files Patent Application for PoolCooled

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Automotive Skills Development Council

PLI, EVs, and Skill Development Key to India’s Auto Future: Dr. Qureshi at ASDC Event

June 25, 2025
AXITEC Energy

AXITEC Energy Strengthens South India Presence with Alphadex Dealership in Karnataka

June 25, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

PLI, EVs, and Skill Development Key to India’s Auto Future: Dr. Qureshi at ASDC Event

AXITEC Energy Strengthens South India Presence with Alphadex Dealership in Karnataka

Top 5 Emerging Opportunities in the LDPE Market

COMAU Unveils MYCO Collaborative Robots at Automatica 2025

Are Your Electronics Ready for Summer Shipping Challenges?

Solar Pumps Surge Ahead: Fueling the Future of Sustainable Water Solutions

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved