Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

SECI Unveils India’s Largest Solar-Battery Project in Chhattisgarh

editor by editor
February 26, 2024
in News
Reading Time: 2 mins read
0
India's Largest Solar-Battery
Share on FacebookShare on TwitterShare on Linkedin

The Solar Energy Corporation of India Limited (SECI), under the aegis of the Ministry of New and Renewable Energy, has successfully commissioned India’s largest Battery Energy Storage System (BESS), which stores energy using solar energy. The 40 megawatts (MW) / 120MWh BESS with a solar photovoltaic (PV) plant which has an installed capacity of 152.325 megawatt hour (MWh)and dispatchable capacity of 100MW AC (155.02 MW peak DC) is located in Rajnandgaon, Chhattisgarh. The energy would be purchased by the state of Chhattisgarh, thus contributing to meeting the peak energy demand of the state using green electrons and also towards its renewable purchase obligations. The project has been dedicated to the nation by Prime Minister Shri Narendra Modi via video conferencing today, February 24, 2024.

The project using solar panels and battery storage represents a monumental leap forward in generation and use of renewable energy. The project utilizes battery storage for storing solar energy when the sun is shining and using it later during hours of peak demand in the evening, for meeting the electricity demand in the state. The project has deployed bifacial modules, which reflect the light from the ground, thus generating more electricity than mono facial modules, hence setting a new standard for large-scale renewable energy projects.

RELATED POSTS

PwC India Opens Sixth NCR Office with New Gurugram Facility

Is the World Ready for Driverless Cars? Consumer Sentiment and Self-Driving Cars Market Potential

A unique aspect of this project is its strategic use of previously unused land. Through a tripartite land-use permission agreement among the Energy Department of the Government of Chhattisgarh, Chhattisgarh State Power Distribution Company Limited (CSPDCL), and SECI, 451 acres of waste land across 9 villages in Tehsil Dongargarh and Dongargaon, District Rajnandgaon, Chhattisgarh, have been repurposed. The project has thus adopted a sustainable approach to energy project development, while minimizing environmental impact.

The project ensures overall power stability and reliability by ensuring an efficient evacuation of power through a 132 kilo-volt (kV) double-circuit double-string transmission line to Chhattisgarh State Power Transmission Company Limited’s (CSPTCL) 220/132 kilovolt (kV) Thelkadih substation, facilitating seamless integration into the existing power grid.

This project is estimated to save tonnes of carbon dioxide emissions annually. SECI’s long-term power purchase agreement with the state electricity distribution company (CSPDCL) underscores the economic viability of the project and support for such renewable energy endeavours.

The project has been constructed with funding from the World Bank and Clean Technology Fund under Innovation in Solar Power & Hybrid Technologies Project as well as leveraged financing from domestic lending agencies. This further highlights the collaborative efforts to drive sustainable financial arrangements, making the project commercially attractive and viable.

This project is expected to have a far-reaching positive impact on the renewable energy landscape and in promoting responsible utilization of land resources in India and globally.

Tags: BESScarbon dioxideChhattisgarhCSPTCLRenewable EnergySECI
ShareTweetShare
editor

editor

Related Posts

PwC India

PwC India Opens Sixth NCR Office with New Gurugram Facility

by Palak
July 24, 2025
0

Tuesday – PwC India today announced the opening of its new office in DLF Downtown 4, Gurugram - its sixth facility in...

Self-driving Cars Market

Is the World Ready for Driverless Cars? Consumer Sentiment and Self-Driving Cars Market Potential

by Palak
July 24, 2025
0

The concept of self-driving cars has long fascinated the world, and in the last decade, this once-futuristic vision has begun...

STMicroelectronics

STMicroelectronics Reports 2025 Second Quarter Financial Results

by Palak
July 24, 2025
0

Q2 net revenues $2.77 billion; gross margin 33.5%; operating loss of $133 million, including $190 million related to impairment, restructuring...

Sharika Enterprises

Sharika Enterprises to Automate BMM Ispat Power with SCADA

by Palak
July 22, 2025
0

New Delhi : Sharika Enterprises Limited has secured a landmark SCADA automation contract from QMeasure Technologies for the Hosapete (Danapur)...

PackPlus 2025

PackPlus 2025 to Showcase India’s Packaging Strength in Delhi

by Palak
July 18, 2025
0

New Delhi - The 19th edition of PackPlus, India’s leading packaging industry event, is slated to take place from July 31...

Next Post
JSPL In Roof Aerial View

JSPL Commissions India's Largest 3.25 MWp Integrated Solar Roof

Alternative Energy Market

Can Alternative Energy Truly Empower Industries with Sustainable Powerhouses?

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Wastewater treatment plants

Turn Up the Heat Next Winter with Better Biogas Production!

July 24, 2025
PwC India

PwC India Opens Sixth NCR Office with New Gurugram Facility

July 24, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Turn Up the Heat Next Winter with Better Biogas Production!

PwC India Opens Sixth NCR Office with New Gurugram Facility

Is the World Ready for Driverless Cars? Consumer Sentiment and Self-Driving Cars Market Potential

STMicroelectronics Reports 2025 Second Quarter Financial Results

Key Hurdles Slowing Electric Cargo Bike Adoption

Sharika Enterprises to Automate BMM Ispat Power with SCADA

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved