Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Tenders

SECI: Selection of Solar Power Developers for setting up of 15 MW Grid Connected Floating Solar PV Power Plant at Nangal Pond, Himachal Pradesh

Urja Daily by Urja Daily
November 17, 2021
in Tenders
Reading Time: 2 mins read
0
SECI
Share on FacebookShare on TwitterShare on Linkedin

This is in reference to RfS No.SECI/C&P/SPD/RfS/15MW/BBMB/072020   regarding the Tender for “Selection of Project Developer for Setting up of 15 MW Grid Connected Floating Solar PV Power Plant at Nangal Pond, Near Village Nella, District Bilaspur, Himachal Pradesh under Domestic Competitive Bidding”

The last date of online bid submission is hereby extended till 07.12.2021 (1800 HRS).

RELATED POSTS

RECPDCL Floats 3 GW ISTS Transmission Tender in Andhra Pradesh

KPTCL Awards 700 MWh in 1 GWh Battery Storage Tender

The last date of offline bid submission is hereby extended till 09.12.2021 (1800 HRS).

The techno-commercial bid opening shall be carried out w.e.f. 1100 HRS on 10.12.2021.              

For downloading Amendment-03, please click here.                                                   

Prospective bidders are requested to remain updated for any notices/ amendments/ clarifications etc. to the RfS documents through the websites www.SECI.com and www.bharat-electronictender.com as no separate notification will be issued. 

Tender Search Code (TSC) for the RfS in ISN-ETS : SECI-2020-TN000021

Tender ID for the RfS in CPPP : 2020_SECI_543431_1

‘Click Here To See Files’

Tags: 15 MW Grid ConnectedFloating SolarPV Power PlantSECI
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

RECPDCL

RECPDCL Floats 3 GW ISTS Transmission Tender in Andhra Pradesh

by Palak
May 28, 2025
0

REC Power Development and Consultancy Limited (RECPDCL) has issued a request for proposal to develop an inter-state transmission system (ISTS)...

KPTCL

KPTCL Awards 700 MWh in 1 GWh Battery Storage Tender

by Palak
April 9, 2025
0

Karnataka Power Transmission Corporation Limited (KPTCL) has announced the results of its 500 MW/1 GWh battery energy storage system (BESS)...

TNGECL

TNGECL Issues Tender for 1 GWh BESS with VGF Support

by Palak
March 18, 2025
0

Tamil Nadu Green Energy Corporation Limited (TNGECL) has initiated the bidding process for the development of six standalone battery energy...

NVVN

NVVN Issues Tender for 1,000 MWh BESS Project in Rajasthan

by Palak
March 3, 2025
0

NTPC Vidyut Vyapar Nigam Limited (NVVN) has invited proposals to develop standalone battery energy storage systems (BESS) with a total...

TGGENCO

TGGENCO Launches Tender for 250 MW/500 MWh BESS Project

by Urja Daily
January 27, 2025
0

Telangana Power Generation Corporation (TGGENCO) has issued a tender to develop a pilot project for a standalone battery energy storage...

Next Post
StoreDot's Extreme fast Charging EV Battery Pouch Cells

Storedot And Group14 Partner To Enhance Extreme Fast Charging Battery Technology

VinFast EV brand 2021 Los Angeles Auto Show

VinFast Launched Its Global EV Brand At The 2021 Los Angeles

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Wastewater treatment plants

Turn Up the Heat Next Winter with Better Biogas Production!

July 24, 2025
PwC India

PwC India Opens Sixth NCR Office with New Gurugram Facility

July 24, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Turn Up the Heat Next Winter with Better Biogas Production!

PwC India Opens Sixth NCR Office with New Gurugram Facility

Is the World Ready for Driverless Cars? Consumer Sentiment and Self-Driving Cars Market Potential

STMicroelectronics Reports 2025 Second Quarter Financial Results

Key Hurdles Slowing Electric Cargo Bike Adoption

Sharika Enterprises to Automate BMM Ispat Power with SCADA

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved