Provision of roof top based 0.1mw solar power plant at RMS Dholpur under GE Bharatpur.

The contractor enlisted upto two classes below the eligible class may also apply / bid. Application from two classes below eligible class applicants may also be considered in the event of inadequate response from the applicants of eligible class and one class below eligible class.

(b) (i) Applications / bids not accompanied by scanned copies of requisite DD / Bankers Cheque towards cost of tender and Bid Securing Declaration (as applicable) shall not be considered for validation of ‘T’ bid and their finance bids will not be opened.

(ii) Tenderers / bidders to note that they should ensure that their original DDs and Bid Securing Declaration (as applicable) are received within 05 days of bid submission end date.

(iii) In case of applications / bids from enlisted contractors of MES, where scanned copies of requisite DD/ Bankers Cheque towards cost of tender has been uploaded but physical copies are not received by the stipulated date, finance bids will be opened. However, non-submission of physical copies of cost of tender shall be considered as willful negligence of the bidder with ulterior motives and such bidder shall be banned from bidding for a period of six months commencing from the date of opening of finance bid.

(iv) In case of applications / bids from unenlisted contractors, where scanned copies of requisite DD / Bankers Cheque towards cost of tender has been uploaded but physical copies are not received by the stipulated date, finance bids will not be opened. Name of such contractors alongwith complete address shall be circulated for not opening of their bids for a period of six months commencing from the date of opening of finance bid.

(v) In case of applications / bids (enlisted contractor as well as unenlisted contractor) where scanned copies of requisite Bid Securing Declaration (as applicable) were uploaded but the same are not received in physical form within stipulated time, such bids shall not qualify for opening of finance bid.

For mora information please click here

Previous articleExtension of Bid Submission Deadline: Tender for 50 MW (AC) Solar PV Project
Next articleDuke Energy Announced 250MW Solar Project in Texas

LEAVE A REPLY

Please enter your comment!
Please enter your name here