Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Oilfields Supply Center $570M Investment in King Salman Energy Park (SPARK)

Urja Daily by Urja Daily
April 22, 2021
in Solar
Reading Time: 2 mins read
0
OSC Rendering

OSC Rendering

Share on FacebookShare on TwitterShare on Linkedin

RIYADH- Oilfields Supply Center Limited (OSC) has announced it awarded a contract for construction of their center in the kingdom with a total investment of $570M in King Salman Energy Park (SPARK). The creation of the OSC base will measure one million square meters and include multiple areas and zones. The center is critical to localize the full energy supply chain, enabling investors to supply to the broader region’s and gain maximum benefit from their presence at SPARK.

Dr. Mohammad Yahya Al-Qahtani, Chairman of the Board of Directors at SPARK said: “Strategically located at the heart of the region’s energy market, SPARK is focused on providing investors with ease of access to the demand for energy good and services. The OSC supply base is a key component of this strategy to create a favorable environment for international and local companies as well as SMEs to accelerate the localization in Saudi Arabia. OSC is providing pre-built industrial solutions which de-risk the set-up phase for investors and give them flexibility to rent industrial facilities and workshops on demand in addition to providing a full set of supporting services. The base is expected to create thousands of jobs in the energy fields.”

RELATED POSTS

Vikram Solar Bags 336 MW Module Supply Order from L&T for Khavda Project

Shweta Solar set to unveil 1.2 GW Advanced Solar Module Manufacturing Facility in NCR

OSC Director and Corporate Affairs General Manger, Iqbal Mohammad Abedin, said: “Reaching this vital milestone has been the focus of all our efforts. It cements OSC’s commitment to realizing our business at SPARK and enabling local content for all companies wanting to do business in Saudi Arabia. We believe this builds on momentum and contributes to a vibrant and world-class ecosystem. We have previously seen significant interest from international companies and Small and Medium Enterprises (SMEs), and following the award we anticipate increased demand for our industrial facilities, with all phases of work to be completed by the fourth quarter of 2023.”

Abedin added: “The creation of an oil and gas supply base on site at SPARK, the region’s only fully-integrated energy hub, is another example of how the project complements Aramco’s In-Kingdom Total Value Add (iktva) program, which encourages the development of a diverse, sustainable and globally competitive energy sector in the Kingdom.”

SPARK is on track to become the leading energy-centric ecosystem in the world, offering a foundation upon which the sector can innovate and grow. OSC’s initial investment of $570 million is expected to contribute to further value creation, as it creates and maintains the oil and gas supply base and provides pre-built solutions for investors and partners of all sizes.

With 80% of its first phase infrastructure development completed, SPARK is the first industrial city in the world to obtain LEED Silver Certification. Construction of the oil and gas supply base by OSC adheres to SPARK’s focus on sustainability and environmentally-friendly design and construction. The project draws green portfolio and experience of delivering engineering and design solutions, which aim to minimize the environmental impact of infrastructure development.

Tags: King Salman Energy ParkOSCSPARK
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Vikram Solar

Vikram Solar Bags 336 MW Module Supply Order from L&T for Khavda Project

by Palak
September 8, 2025
0

Kolkata – Vikram Solar has announced a major order win of 336 MW high-efficiency solar modules from L&T Construction. These...

Shweta Solar

Shweta Solar set to unveil 1.2 GW Advanced Solar Module Manufacturing Facility in NCR

by Palak
September 5, 2025
0

New Delhi : Shweta Solar Pvt. Ltd. (Shweta Solar) is all set to launch a new 1.2 GW solar module manufacturing...

IGL and RVUNL

IGL and RVUNL Forge Joint Venture for Rajasthan Solar Farms

by Palak
September 3, 2025
0

Indraprastha Gas Limited (IGL) and Rajasthan Rajya Vidyut Utpadan Nigam Limited (RVUNL) have inked a joint venture (JV) agreement to...

Premier Energies

Premier Energies Bags ₹27.03 Billion Orders for Solar Modules and Cells

by Palak
September 2, 2025
0

Premier Energies Limited has secured orders worth Rs 27.03 billion for the supply of solar photovoltaic modules and cells with...

GH2 Solar

GH2 Solar, AHES to Establish Electrolyser Manufacturing Facility in Madhya Pradesh

by Palak
September 2, 2025
0

GH2 Solar Limited, in a joint venture with Advanced Hydrogen Energy Solutions (AHES) Limited, will set up an electrolyser manufacturing...

Next Post
solar park

SunPower Announced New Projects for Solar Systems

evgo fast charger

EVgo Celebrates Earth Day by Opening 4 New EV Fast Chargers

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Mr. Raman Bhatia with Jerry Nie Sino Zhuhai Piwin New Energy Co., Ltd

Servotech Renewable Power Partners with Zhuhai Piwin New Energy in Exclusive Deal

September 8, 2025
Vikram Solar

Vikram Solar Bags 336 MW Module Supply Order from L&T for Khavda Project

September 8, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Servotech Renewable Power Partners with Zhuhai Piwin New Energy in Exclusive Deal

Vikram Solar Bags 336 MW Module Supply Order from L&T for Khavda Project

What Are the Latest Technological Innovations in Fuel Cell Vehicles?

Shweta Solar set to unveil 1.2 GW Advanced Solar Module Manufacturing Facility in NCR

Transmission Lines: Myths, Facts, and Why They Matter for Powering India’s Future

UAE Energy Undersecretary Visits Tellus Power Globe Holding’s Hong Kong Office

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved