NTPC Renewable Energy Limited (NTPC REL) has commissioned the 105 MW Shajapur Solar Project (Unit-I) in Shajapur Solar Park, Madhya Pradesh.
The project was developed in two phases, with the first 55 MW achieving commercial operation on November 29, 2024, and the remaining 50 MW commissioned on March 13, 2025. With this addition, the total installed and commercial capacity of NTPC Group has reached 77,461.50 MW.