Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Storage

Britishvolt Appoints ISG As Construction Partner For Battery Gigaplant

Urja Daily by Urja Daily
December 15, 2020
in Storage
Reading Time: 2 mins read
0
Britishvolt
Share on FacebookShare on TwitterShare on Linkedin
  • UK’s first battery gigaplant will be built in Blyth, Northumberland and will be operational by the end of 2023
  • Global construction specialist ISG will lead the build of the Britishvolt gigaplant
  • Britishvolt gigaplant has been designed by Pininfarina and will produce world-class lithium-ion batteries for the automotive and energy storage industries
  • £2.6bn total investment: gigaplant will provide 3000 jobs and up to 5000 in the wider supply chain

Britishvolt, the UK’s foremost investor in battery technologies, has appointed global specialist ISG to lead construction on the UK’s first battery gigaplant.

The new gigaplant will be sited in Blyth, Northumberland, with construction planned to commence in Summer 2021. The result of £2.6bn investment, it will begin producing world-class lithium-ion batteries for the automotive and renewable energy industries at the end of 2023. Construction of further phases will continue until the end of 2027.

RELATED POSTS

Hindustan Power Secures LoI for 120 MWh Battery Energy Storage Project in Bihar

California Energy Commission Approves Solar-plus-Storage Project in Fresno County

ISG has a 30-year legacy of large-scale global production projects. It has recently delivered over £2.5bn worth of data centre projects and £750M of logistics and distribution centres across the globe. It is also currently working two flagship schemes in London: University College’s £280M neuroscience hub and the Oak Cancer Centre at the Royal Marsden Hospital.

Britishvolt CEO, Orral Nadjari “We’re delighted to have engaged ISG as the construction partner for our Blyth gigaplant. Its long expertise of delivering global projects will be crucial to meeting our exacting standards and tight timeframe.

“Especially key is that ISG’s frontline team delivered Jaguar Land Rover’s production facility in Nitra, Slovakia, giving Britishvolt hugely relevant and recent experience in delivering large-scale projects such as ours.

“Our gigaplant project is now on track in every key area: construction, product development, funding and a high-level of customer engagement for our world-class lithium-ion batteries. We will be production ready at the end of 2023. It’s essential that we are ready to power the future as quickly as possible.”

ISG CEO, Paul Cossell “This landmark project to build the UK’s first gigaplant is one of the most visible signs that we are confidently stepping up to meet the challenge of new zero emissions by 2050 and closely aligned with the government’s key commitment to cease petrol and diesel car manufacturing by 2030. The construction phase alone will directly support thousands of jobs in the North East and create a wealth of training and upskilling opportunities for local communities. The legacy of this major investment will benefit the region for generations to come.”

The gigaplant is being designed by leading Italian design experts Pininfarina. It will be built on a 95-hectare site, formerly the site of the Blyth Power Station. It will exclusively use renewable energy, including the potential to use hydro-electric power generated in Norway and transmitted 447 miles under the North Sea via the world’s longest inter-connector from the North Sea Link project.

Tags: AutomotiveBattery GigaplantBritishvolthydro-electric powerLithium-ion batteriesRenewable Energy
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Hindustan Power

Hindustan Power Secures LoI for 120 MWh Battery Energy Storage Project in Bihar

by Palak
June 21, 2025
0

Hindustan Power has received a letter of intent (LoI) from Bihar State Power Generation Company Limited to develop a 120...

California Energy

California Energy Commission Approves Solar-plus-Storage Project in Fresno County

by Palak
June 20, 2025
0

The California Energy Commission (CEC) has approved the Darden Clean Energy Project under the state’s Opt-In Certification program. The project...

Volks Energie

Volks Energie Secures Solar-Plus-Storage Project from BPCL

by Palak
June 19, 2025
0

Volks Energie has received a second contract from Bharat Petroleum Corporation Limited (BPCL) to deploy an off-grid solar photovoltaic and...

Saft

Saft to Deliver BESS for Gurīn’s Energy Storage Project in Japan

by Palak
June 17, 2025
0

Saft will supply a battery energy storage system (BESS) for Gurīn Energy’s (Gurīn) energy storage project. The energy storage project...

Envision Energy

Envision Energy Partners with SUN Terra to Build Comprehensive Energy Storage Ecosystem

by Palak
June 16, 2025
0

Envision Energy Group has entered into a strategic partnership with SUN Terra to develop a complete energy storage ecosystem across...

Next Post
Delta Supplies High-Efficiency PV Inverters for Southern Germany’s Largest Ground-mounted Solar Plant

Delta Supplies High-Efficiency PV Inverters for Southern Germany's Largest Ground-mounted Solar Plant

Lithium-ion Battery Recycling-1

Li-Cycle Named to the Annual Global Cleantech 100

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

JSW Ventures

StayVista Raises Over INR 40 Cr in Funding Round Led by JSW Ventures

June 27, 2025
EIA Data

EIA Data Reveals Record-Breaking Renewable Energy Generation in April

June 27, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

StayVista Raises Over INR 40 Cr in Funding Round Led by JSW Ventures

EIA Data Reveals Record-Breaking Renewable Energy Generation in April

Key Growth Drivers of the U.S. Charging-as-a-Service Market

Sustain Labs Paris Unveils 2025 Climate Leaders Cohort with 47% Indian Representation

THDCIL to Supply 184.08 MW Clean Power to Gujarat from Tehri PSP

PLI, EVs, and Skill Development Key to India’s Auto Future: Dr. Qureshi at ASDC Event

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved