Bharat Heavy Electricals Limited (BHEL) has received an order from Adani Power Limited for setting up the 2×800 MW thermal power plant (TPP) at Raipur, Chhattisgarh. The scope of work includes
supply of equipment (boiler, turbine, generator) and supervision of erection and commissioning for power project based on supercritical technology. The worth of the project is estimated to be Rs 35 billion.