Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Amara Raja Infra Wins SECI’s BoS Auction for 300 MW Solar Project

Urja Daily by Urja Daily
February 4, 2025
in Solar
Reading Time: 1 min read
0
Amara Raja Infra
Share on FacebookShare on TwitterShare on Linkedin

Amara Raja Infra Private Limited (ARIPL), a subsidiary of battery manufacturer Amara Raja, has won the Solar Energy Corporation of India Limited’s (SECI) auction to supply the balance of systems (BoS) for a 300 MW grid-connected solar power project at Ramagiri, Andhra Pradesh.

The tender was issued in March 2024. The scope of work includes designing, engineering, procuring, constructing, and commissioning the project, along with five years of comprehensive operation and maintenance. However, the contract does not cover solar modules, which SECI will supply. The project is required to be completed within 18 months. The project contract is valued at Rs 5.44 billion. The contractor will be responsible for inspecting all solar modules supplied by SECI at the site and must provide the necessary test and guarantee certificates for material and equipment performance. The 300 MW project is part of the Central Public Sector Undertaking Scheme Phase II, which aims to develop 12,000 MW of grid-connected solar projects across India. These projects are eligible for the viability gap funding.

RELATED POSTS

Solex Energy Unveils Two Next-Gen High-Efficiency Solar Solutions

Delhi Government Issues Amendments to Solar Energy Policy 2023

Tags: Amara raja InfraBoSpowerSECIsolar
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Solar Energy

Solex Energy Unveils Two Next-Gen High-Efficiency Solar Solutions

by Palak
July 22, 2025
0

This marks Solex’s focused expansion in Rajasthan, bringing robust, efficient & climate-resilient solar technology to support the region’s growing renewable...

Delhi Government

Delhi Government Issues Amendments to Solar Energy Policy 2023

by Palak
July 21, 2025
0

The Delhi Government has notified the first amendment to its Delhi Solar Energy Policy 2023, raising the subsidy for residential...

Sol Systems

Sol Systems Secures $675 Million for US Solar and Storage Portfolio

by Palak
July 21, 2025
0

Sol Systems has secured $675 million revolving construction finance facility for its solar and storage projects portfolio. The facility will...

MNRE

MNRE Unveils 435 MW Gorbea Solar Power Project in Rajasthan

by Palak
July 21, 2025
0

Ministry of New and Renewable Energy (MNRE) inaugurated the 435 MW Gorbea solar power project as developed by Zelestra India...

WattPower Solar

WattPower, First Solar Host ‘Solar Connect’ to Promote Agri-Solar in Telangana

by Palak
July 18, 2025
0

New Delhi – WattPower hosted a high-level industry roundtable, ‘Solar Connect’, at Vivanta, Hyderabad. The event brought together policy influencers, clean energy...

Next Post
Nuclear Power Plants

Indonesia to Develop 4.3 GW Nuclear Power Plants

Senvion India

Senvion India, Voodin Partner for Wooden Turbine Blades

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Wastewater treatment plants

Turn Up the Heat Next Winter with Better Biogas Production!

July 24, 2025
PwC India

PwC India Opens Sixth NCR Office with New Gurugram Facility

July 24, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Turn Up the Heat Next Winter with Better Biogas Production!

PwC India Opens Sixth NCR Office with New Gurugram Facility

Is the World Ready for Driverless Cars? Consumer Sentiment and Self-Driving Cars Market Potential

STMicroelectronics Reports 2025 Second Quarter Financial Results

Key Hurdles Slowing Electric Cargo Bike Adoption

Sharika Enterprises to Automate BMM Ispat Power with SCADA

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved