Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Editor's Pick Articles

Impact of The Increased Cost of Solar Panels on The Solar Energy Sector of India

Urja Daily by Urja Daily
September 14, 2021
in Articles
Reading Time: 4 mins read
0
Oorjan Cleantech
Share on FacebookShare on TwitterShare on Linkedin

India aims to develop the world’s largest clean energy program by 2022, with 175 GW of renewable energy capacity and 100 GW of solar power. By 2030, the country’s power demand will be 817 GW, with more than half of that coming from clean energy and 280 GW coming from solar energy alone. One of the key selling features that have helped solar power become the world’s fastest-growing energy source is cost reduction, which has just encountered a snag due to recent increases in solar module pricing. Solar module prices have increased by 18% since the beginning of 2021, after plummeting by 90% over the previous decade.

The value of projects awarded in the last six to nine months will be impacted by a rise in solar photovoltaic (PV) module prices. The government intends to impose a 40 percent basic customs duty (BCD) on solar modules and a 25 percent BCD on solar cells beginning April 1, 2022. This is one of the first stages toward the capacity secured by developers through the procurement process over the last six to nine months at rates ranging mostly between Rs. 2.00 and 2.25 per unit, with units scheduled to be commissioned over the following 12 to 15 months. The price increase is mostly due to a significant increase in the price of polysilicon, a vital input for cell and module manufacturing. Metal prices have recently increased, putting increasing pressure on the overall capital cost of solar generating installations. Chinese module manufacturers have recently hiked their costs by more than a fifth and begun cancelling contracts to provide equipment.

RELATED POSTS

Managing Peak Power Demand: How BESS Can Help Commercial Establishments Optimise Energy Consumption

The “Solar Shelf-Life” Problem and how today’s Best Module Become Obsolete Before Its 25-Year Warranty Ends?

For the majority of solar power projects in India, imports are heavily reliant on PV modules, therefore if the price of PV modules continues to rise, it will be a near-term headwind. It has a significant influence on solar projects in two ways: it delays them past their deadlines and slows the uptake of solar power, precisely as numerous major economies have begun to recognize the role of solar power in reducing climate change.

PV module components account for roughly 50-55 percent of the total project cost, therefore a sustained increase in module prices of about 4-5 percent per watt will have a 12-14 basis point impact on project developers’ debt service coverage criteria. The tariff increase needed to counterbalance such a module price rise is expected to be around 20-22 paise per unit. The impact on the imported PV modules is expected to raise the overall bid tariff for the upcoming auctions by around 55-60 paise/unit. After accounting for the dual impact, the solar bid tariff is projected to remain below Rs. 3/unit.

As the notification for cells and modules takes effect in April 2022, both module price behaviour and the fulfillment of supply contracts by Chinese module Original Equipment Manufacturer (OEMs) will continue to be important factors for solar power providers. The considerable ambiguity surrounding the deadlines for the inclusion of Chinese module providers on the Approved List of Models and Manufacturers (ALMM) may have an impact on the solar power sector’s incremental bidding activity. The cost of solar panels has risen, and investment returns may suffer as a result. This sharp surge in prices has alarmed developers who have won projects that have yet to be commissioned, as 85-90 percent of solar modules used in India are imported from China.

Modules account for a huge percent of the project’s total cost, and since Independent power providers (IPPs) have lower margins in the Indian solar energy sector, and even a small increase in module pricing will put them under more strain. For projects that have already signed a power purchase agreement, the increase in module costs has an influence on the Internal Rate of Return (IRR) (PPA). Unless the customer is willing to pay a higher electricity tariff, large-scale projects that have yet to negotiate price agreements (PPAs) with utilities may be delayed. The polysilicon shortfall is expected to last at least through the first half of 2022. Other raw material prices, such as silver and glass, are also on the rise, so it will affect the entire ecosystem. 

The viability of all the projects will be a major concern. 50% of projects will be able to keep themselves viable depending on the number of days they get to work after the delivery of panels. Large project developers are finding it difficult to maintain their projects profitable after buying panels in the final phase of development, i.e. 10-12 months after signing the PPA. The significant rise in steel prices, as well as the uncertainty surrounding safeguard duty, have contributed to their misery. The recently established Production Linked Incentive (PLI) scheme would improve solar panel availability in India, stabilizing project costs in the future. DISCOMs are experiencing financial difficulties, and tariff changes are sporadic and insufficient. As a result, most private players cannot rely on and power markets alone to stay profitable. They have to rely on repeated injections of liquidity through schemes like UDAY (Ujwal DISCOM Assurance Yojana) and entities like Power Finance Corporation Ltd (PFC). Because it’s impossible to forecast where the next subsidy will come from, scale and sprawl develop.

Large corporations integrate vertically to ensure that they are one of the beneficiaries of any subsidies that are implemented. They can utilize it to keep the rest of your power business afloat as long as some arm of the Indian government is paying the solar energy businesses or injecting liquidity.

Tags: Clean EnergyEnergypowerRenewable EnergySolar Power
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Ravi Kumar

Managing Peak Power Demand: How BESS Can Help Commercial Establishments Optimise Energy Consumption

by Urja Daily
September 24, 2026
0

There is one line on every high-tension electricity bill in Maharashtra that businesses often treat as fixed: the demand charge. Unlike...

Dushyant Kumar, PV Quality Manager

The “Solar Shelf-Life” Problem and how today’s Best Module Become Obsolete Before Its 25-Year Warranty Ends?

by Urja Daily
September 23, 2026
0

India’s solar sector is confronting an unexpected shift: while photovoltaic modules are lasting longer than ever, they may be losing...

Mr. Devesh Taparia, CEO, DriveX

Why refurbished bikes are finding a place in India’s value-conscious Market?

by Urja Daily
September 19, 2026
0

For most Indians, a bike has been their preferred mode of transport in the most practical sense. It takes someone...

Rajat Gupta

Grew Solar Appoints Rajat Gupta as Head of Marketing & Communications

by Palak
September 1, 2026
0

Ahmedabad, India : Grew Solar has appointed Rajat Gupta as its Head of Marketing & Communications. In this role, he will lead the company's brand strategy, corporate communications, digital marketing,...

Tanmoy Duari

Has India Moved Too Fast on Solar Cell Localisation?

by Palak
August 25, 2026
0

India's DCR policy is accelerating domestic manufacturing—but is the upstream ecosystem ready to support the transition? India's solar manufacturing story...

Next Post
solar-energy

Kenosha Area Group To Help Community Transition To Solar Energy

Enapter_open_graph

10,000 Green Hydrogen Generators Per Month: Enapter Electrolyser

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

AmpereHour Energy

AmpereHour and Ampt Announce Strategic Partnership to Advance Direct-to-Battery DC-Coupled Storage Solutions Across India and Key Global Markets

October 8, 2026
Prozeal Green Energy

Prozeal Green Energy Signs ₹4,600 Million Framework Agreement with European IPP for 100 MW Gujarat Solar Project

October 8, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0

AmpereHour and Ampt Announce Strategic Partnership to Advance Direct-to-Battery DC-Coupled Storage Solutions Across India and Key Global Markets

Prozeal Green Energy Signs ₹4,600 Million Framework Agreement with European IPP for 100 MW Gujarat Solar Project

TARIL Secures Large Order from GETCO for 500 MVA Auto Transformers and Shunt Reactors

Industrial Futures Unveiled: 15,000 sqm of Innovation, Four Technology Areas and a Transformative Industry Programme

From the South Pole to a Billion Dreams: Neutrino Energy Group India Congratulates Professor Francis Halzen on the 2026 Nobel Prize in Physics

VinFast VF 3 Honoured As “Trusted & Popular Brand 2026” At Disway Awards

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved