Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

Cochin Port Trust Tenders for 1.5 MW Floating Solar Projects in Kerala

Urja Daily by Urja Daily
September 17, 2020
in News
Reading Time: 2 mins read
0
Cochin Port Trust Tenders for 1.5 MW Floating Solar Projects in Kerala
Share on FacebookShare on TwitterShare on Linkedin

The Cochin Port Trust has issued a tender for 1.5 MW grid-tied floating solar projects at the Backwaters near CoPT’s walkway avenue in Kerala.

The Cochin Port Trust (CoPT) has issued a tender, inviting bids from eligible bidders for setting up of 1.5 MW (0.75 MW x 2) grid-tied floating solar projects at the Backwaters near CoPT’s walkway avenue between BOT junction and Kannangatt bridge at W/Island, Cochin, Kerala.

RELATED POSTS

Bang & Olufsen Teams Up with Breathe Battery Technologies to Boost Battery Life and Product Longevity

Mobisoft Enhances FleetNXT Platform for Higher Efficiency and Major Cost Savings in Event Transportation

The scope of work for the selected developers will include the site survey, design, engineering, manufacture, supply, storage, civil work, erection, testing and commissioning of the 1.5 MWp floating projects. The work on commissioning of the plant must be completed within a period of 8 months from the date of execution of the Power Purchase Agreement (PPA).

The developers will also be required to provide comprehensive Operation & Maintenance (O&M) service’s for the projects for a period of 25 years under RESCO Model (BOOT) after operational acceptance.

The last date for bid submission is October 5, 2020, and the techno-commercial bids will be opened on the same date. A pre-bid meeting has been scheduled for September 21, 2020, to address the concerns raised by prospective bidders.

All bidders will be required to submit an Earnest Money Deposit of Rs 13.5 lakh along with the bids and a performance bank guarantee (PBG) of Rs 67.50 lakh must be furnished by the successful bidder after the issuance of Letter of Award (LoA) by the Cochin Port Trust.

The selected bidders will sign a PPA with the CoPT for a period of 25 years and the maximum allowable levelised tariff for the entire duration of the PPA (for RESCO model) will be Rs 3.97 kWh.

To be eligible, the bidders must have experience of having successfully completed similar works during last 7 years ending on August 31, 2020, at least either:

a. Three similar completed works, each single contract costing not less than Rs 2.70 crore. (or installed 0.60 MWp) OR

b. Two similar completed works, each single contract costing not less than Rs 3.38 crore (or installed 0.75 MWp)’ OR

c. one similar completed work costing not less than Rs 5.4 crore (or installed 1.20 MWp).

Financially, the average financial turnover of the tenderer during the last 3 financial years ending 31st March 2019, should not be less than Rs 2.03 crore.

Tags: Cochin Port Floating SolarCochin Port TrustFloating SolarIndiaKeralaProjectstender
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Dr. Ian Campbell

Bang & Olufsen Teams Up with Breathe Battery Technologies to Boost Battery Life and Product Longevity

by Palak
September 1, 2025
0

Disposable tech is out. Bang & Olufsen and BREATHE Battery Technologies are leading the shift towards lasting intelligent design. Together,...

Mr. Nitin Lahoti

Mobisoft Enhances FleetNXT Platform for Higher Efficiency and Major Cost Savings in Event Transportation

by Palak
August 30, 2025
0

Pune – Mobisoft Infotech has announced a significant upgrade to its event transportation platform with the release of FleetNXT 2.0. The enhanced version delivers...

Mukesh Singla

Zypp Electric Names Mukesh Singla as New Chief Financial Officer

by Palak
August 30, 2025
0

Gurugram – Zypp Electric announced the appointment of Mukesh Singla as Chief Financial Officer (CFO) effective from 1st August, 2025.  Mukesh...

Flipkart

Flipkart Expands Supply Chain Network Across India with New Facilities in Key Cities

by Palak
August 30, 2025
0

Bengaluru, Karnataka, India Spanning 35 lakh sq. ft., the expanded network of the Flipkart centers is designed to power festive...

ACME Emerges

ACME Emerges Winner Again in SECI’s Green Ammonia Auction

by Palak
August 26, 2025
0

ACME Cleantech Solutions Private Limited (ACME) has emerged as the winner of Solar Energy Corporation of India’s (SECI) green ammonia...

Next Post
The World can and Must Achieve Net-Zero Emissions by 2050

The World can and Must Achieve Net-Zero Emissions by 2050

TN, AP and Telangana Account for 71% Discom Dues to RE Generators

TN, AP and Telangana Account for 71% Discom Dues to RE Generators

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

SAEL

SAEL Commissions 200 MW Solar Project in Rajasthan

September 1, 2025
Meenakshi Energy

Meenakshi Energy Commissions 1,000 MW Thermal Power Plant in Andhra Pradesh

September 1, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

SAEL Commissions 200 MW Solar Project in Rajasthan

Meenakshi Energy Commissions 1,000 MW Thermal Power Plant in Andhra Pradesh

NLC India Begins Operations of 300 MW Solar Project’s First Phase in Rajasthan

Power Mech Projects Wins ₹3.71 Billion Contract from Mahan Energen

ACEN Australia Gains Green Light for 900 MW Wind Project

Bang & Olufsen Teams Up with Breathe Battery Technologies to Boost Battery Life and Product Longevity

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved