Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Tenders

Supply of 60KWP Grid Connected Roof Top Model Solar Plant

Urja Daily by Urja Daily
July 8, 2021
in Tenders
Reading Time: 1 min read
0
Roof Top Model Solar Plant
Share on FacebookShare on TwitterShare on Linkedin

Tenders are invited online Bid from the eligible bidders having Class III, Digital Signature Certificate (DSC) issued from any agency authorized by Controller of Certifying Authority (CCA), Govt. of India. The Description & Specification are mentioned in the Tender.

According to the tender, for Technical Specification & Scope of work refer As per Annexure – I. 2 months is the delivery required from the date of PO. For Supply 90% payment required along with 100% taxes, within 30 days from the date of receipt and acceptance of the material at Midhani and for Services 90% payment along with 100% taxes, within 30 days from the date of erection & commissioning on Indentor’s certification. Balance 10% payment of both supply and service shall be done after acceptance of the material at our end, successful commissioning and against submission of Performance Bank Guarantee for 10% value of the order valid till Guarantee / Warranty Period.

RELATED POSTS

RECPDCL Floats Tender for Maharashtra Substation Project

Italy Launches €15.9 Million Tender to Boost Solar Energy Deployment

The offer should be valid for a minimum period of 180 Days from the date of opening of tender. The tenderer/bidder shall furnish EMD, as mentioned in the document at the time of submission of bid. The successful tenderer/Bidder shall be required to furnish SD amount of 3% of purchase order value within 21 days from the date of Purchase Order All Central PSU and Govt. departments may be exempt from submission of SD in all tenders.

For more information please Download

Tags: 60KWP GridPSURoof TopSolar Plant
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

RECPDCL

RECPDCL Floats Tender for Maharashtra Substation Project

by Palak
September 3, 2025
0

REC Power Development and Consultancy Limited (RECPDCL) has floated a tender to set up a 400/132 kV AIS substation in...

Solar Energy

Italy Launches €15.9 Million Tender to Boost Solar Energy Deployment

by Palak
August 8, 2025
0

Pavia Acque Scarl, the integrated water service company of Pavia city, has launched a €15.89 million tender for solar photovoltaic...

RECPDCL

RECPDCL Floats 3 GW ISTS Transmission Tender in Andhra Pradesh

by Palak
May 28, 2025
0

REC Power Development and Consultancy Limited (RECPDCL) has issued a request for proposal to develop an inter-state transmission system (ISTS)...

KPTCL

KPTCL Awards 700 MWh in 1 GWh Battery Storage Tender

by Palak
April 9, 2025
0

Karnataka Power Transmission Corporation Limited (KPTCL) has announced the results of its 500 MW/1 GWh battery energy storage system (BESS)...

TNGECL

TNGECL Issues Tender for 1 GWh BESS with VGF Support

by Palak
March 18, 2025
0

Tamil Nadu Green Energy Corporation Limited (TNGECL) has initiated the bidding process for the development of six standalone battery energy...

Next Post
SECI

100 MW (AC) Solar PV Project Along with 40MW/120 MWh BESS at Rajnandgaon :SECI

p2_act_renewables

ArcLight Announced Closing of Renewable Infrastructure Fund

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

VinFast

VinFast Expands into Hyderabad with Dual Showroom Launch

September 26, 2025
Mr. Saleem Ahmed, Officiating Head, ESSCI

India Can Lead in Semiconductor Innovation, If We Skill Right

September 25, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

VinFast Expands into Hyderabad with Dual Showroom Launch

India Can Lead in Semiconductor Innovation, If We Skill Right

Samsung and Videotex Partner to Expand Tizen OS TVs in India

Mitsubishi Electric Launches KEGMIL to Streamline Elevator and Escalator Service Management

Zen Mobility Launches Pixi Pod and Pico Pod for Urban EV Needs

Renewables Resilience: July Data Shows Growth Amidst Anti-Clean Energy Bills

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved