Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Power

L&T Secured a Significant Order Nuclear Sector from NPCIL

Urja Daily by Urja Daily
February 19, 2021
in Power
Reading Time: 1 min read
0
nuclear
Share on FacebookShare on TwitterShare on Linkedin

L&T has secured a significant order in the Nuclear sector from Nuclear Power Corporation of India Limited (NPCIL) for its Heavy Civil Infrastructure business in India to construct the Main Plant Civil Works of the Kudankulam 5 & 6 units (KKNPP 5&6 – 2X1000 MWe)
The Kudankulam Nuclear Power Plant is India’s first Light Water Reactor (LWR) of 6 units with a generation capacity of 1000 MWe each.

The scope of work includes construction of the Reactor Building, Reactor Auxiliary Building, Turbine Building, Diesel Generator Building and other Safety Related Structures in a duration of 64 Months.
L&T is currently executing similar works of Kudankulam 3&4 units (KKNPP 3&4) in the same premises.

RELATED POSTS

Waaree Transpower secures over Rs 1 billion transformer order from NTPC

AESL Wins Bihar Transmission Project to Evacuate Power from 2,400 MW Pirpainti Plant

Tags: Kudankulam Nuclear Power PlantL&TNPCILNuclear Sector
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Waaree Renewable

Waaree Transpower secures over Rs 1 billion transformer order from NTPC

by Palak
November 24, 2026
0

Waaree Transpower, a subsidiary of Waaree Energies, has secured an order worth over Rs 1 billion from NTPC for supplying...

AESL

AESL Wins Bihar Transmission Project to Evacuate Power from 2,400 MW Pirpainti Plant

by Palak
November 24, 2026
0

Adani Energy Solutions Limited (AESL) has secured a transmission project for evacuating power from the upcoming 2,400 MW Pirpainti thermal...

RECPDCL

RECPDCL transfers Vikramshila Power Transmission SPV to AESL

by Palak
November 23, 2026
0

REC Power Development and Consultancy Limited (RECPDCL) has transferred Vikramshila Power Transmission Limited, a project-specific special purpose vehicle (SPV) for...

Power

AESL Wins Bihar Transmission Project to Facilitate Power Evacuation from 2,400 MW Pirpainti Plant

by Palak
November 21, 2026
0

Adani Energy Solutions Limited (AESL) has secured a transmission project for evacuating power from the upcoming 2,400 MW Pirpainti thermal...

Oriana Power

TrueRE Oriana Power to Set up Five CBG Projects Across Three States with 110 TPD Capacity; to Invest Rs. 750 Crores

by Palak
November 20, 2026
0

New Delhi, Delhi, India - TrueRE Oriana Power Limited, listed on NSE Emerge, and one of India’s leading integrated renewable...

Next Post
Jinko Solar

JinkoSolar to Sign MoUs with Tongwei for Project Investment and Industrial Chain Cooperation

wind energy

EDF Renewables, Enbridge and Wpd Launch Construction of the Calvados Offshore Wind Farm

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Armee Infotech

Armee Infotech signs MoU with MSEDCL for 135 MW solar project in Maharashtra

November 24, 2026
Waaree Renewable

Waaree Transpower secures over Rs 1 billion transformer order from NTPC

November 24, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Armee Infotech signs MoU with MSEDCL for 135 MW solar project in Maharashtra

Waaree Transpower secures over Rs 1 billion transformer order from NTPC

AESL Wins Bihar Transmission Project to Evacuate Power from 2,400 MW Pirpainti Plant

Juniper Green Energy Commissions 109 MWp Solar and 95 MWh Battery Storage Capacity

RECPDCL transfers Vikramshila Power Transmission SPV to AESL

Bihar Signs ₹1.72 Trillion MoUs for Nuclear Power and Pumped Storage Projects

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved