Waaree Energies Limited has commenced commercial production at its 1,400 MW monocrystalline PERC (mono PERC) solar cell manufacturing facility in Chikhli, Gujarat. This marks the first phase of its planned 5,400 MW solar cell manufacturing facility. The second phase will introduce 4,000 MW of high-efficiency TOPCon solar cells.
The facility is equipped with advanced production lines, high levels of automation, and stringent quality control measures to ensure efficiency and reliability. Furthermore, it aligns with India’s efforts to build a self-sufficient solar manufacturing ecosystem under the Make in India and Atmanirbhar Bharat initiatives.
In January 2025, Waaree Energies Limited supplied 132.5 MWp of high-performance 575/580 MWp n-Type TOPCon solar modules, designed specifically for enhanced energy efficiency and performance across varying environmental conditions, to Radiance Renewables Private Limited.