Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Vikram Solar Secures 326 MW Solar Project Order from GIPCL at Khavda

The latest order brings the total contribution to the Khavda Renewable Energy Park to approximately 577 MW from Vikram Solar alone

Palak by Palak
May 12, 2025
in Solar
Reading Time: 1 min read
0
Vikram Solar
Share on FacebookShare on TwitterShare on Linkedin

Kolkata :  Vikram Solar Limited has secured a significant order from Gujarat Industries Power Company Limited. It will supply 326.625 MW of high-efficiency solar modules for the 2375 MW Khavda Renewable Energy Park—a key project in the Great Rann of Kutch, Gujarat.

The latest order brings its total contribution to the prestigious Khavda Renewable Energy Park (estimated to be 2375 MW overall) to approximately 577 MW—a considerable share of this development. Expected to be fully operational by December 2026, the park will also aim to generate employment opportunities in the region.

RELATED POSTS

GameChange Solar Boosts Manufacturing Capacity in Saudi Arabia

Waaree Renewable Secures LoA for 300 MW Solar EPC Project in Rajasthan

The modules are scheduled for delivery in FY 25-26, further reinforcing Vikram Solar’s leadership in India’s green energy transition. This order underscores the company’s commitment in delivering high-performance solar modules designed to withstand challenging climatic conditions.

Mr. Gyanesh Chaudhary, Chairman & Managing Director of Vikram Solar, stated: “We are thrilled to secure this order, which reinforces the strong and enduring relationship between Vikram Solar and GIPCL. The Khavda project represents more than just scale—it symbolizes a collective push toward energy security and sustainability. With this order, we are contributing to one of the most important renewable energy projects in India.”

Tags: GIPCLpowerRenewable EnergysolarVikram Solar
ShareTweetShare
Palak

Palak

Related Posts

GameChange

GameChange Solar Boosts Manufacturing Capacity in Saudi Arabia

by Palak
June 5, 2025
0

GameChange Solar has expanded its regional manufacturing capacity in the Kingdom of Saudi Arabia to 6 GW annually. The expansion...

Waaree Renewable

Waaree Renewable Secures LoA for 300 MW Solar EPC Project in Rajasthan

by Palak
June 5, 2025
0

Waaree Renewable Technologies Limited has received a letter of award (LoA) from  Purvah Green Power for the engineering, procurement, and...

NTPC Green Energy

NTPC Green Energy Invites Bids for 600 MW Solar Module Supply in Gujarat

by Palak
June 5, 2025
0

NTPC Green Energy Limited has released a tender for bifacial crystalline solar modules supply for a 600 MW solar power...

Vikram Solar

Vikram Solar Receives SEBI Approval for IPO

by Palak
June 4, 2025
0

Vikram Solar Limited, one of India’s largest solar photo-voltaic (“PV”) modules manufacturers in terms of installed capacity, with more than...

Servotech

Servotech Bags 7.8 MW Solar Rooftop Project from Northeast Frontier Railway

by Palak
June 4, 2025
0

New Delhi : Servotech Renewable Power System Ltd. has been awarded a significant order for a 7.8 MW grid-connected solar...

Next Post
BML Munjal University

BML Munjal University Honors Mothers with Heartfelt Self-Shot Film ‘She Taught Me First’

Renewable Power

Renewables Set to Surpass 37% of Global Power Capacity Within Three Years

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Recyclekaro Plant

Recyclekaro Group Brings Recycling to the Doorstep with Its New D2C Platform

June 7, 2025
Servotech

Errol Musk Wraps Up 6-Day India Tour, Applauds Green Tech and Rich Culture

June 7, 2025
  • 643 Followers
  • 23.9k Followers

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Recyclekaro Group Brings Recycling to the Doorstep with Its New D2C Platform

Errol Musk Wraps Up 6-Day India Tour, Applauds Green Tech and Rich Culture

HyperloopTT’s Italian Project Begins Operations

World Environment Day 2025

AI and Machine Learning Driving Innovation in ADAS Market

Comau Showcases E-Drive and Stator Tech at CWIEME 2025

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved