Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

UPNEDA Invites Bids for 7 MW Rooftop Solar Systems

editor by editor
July 9, 2024
in Solar
Reading Time: 1 min read
0
UPNEDA
Share on FacebookShare on TwitterShare on Linkedin

The Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) has issued three request for proposals for a total capacity of 7 MW on grid-rooftop solar projects including a battery packup for captive-use on government buildings. Tender 1, 2 and 3 involves deployment of 4 MW, 2 MW, and 1 MW of rooftop solar systems with battery backup. The capacities will range from 11 kW to 50 kW for tender 1, 1 kW to 10 kW for tender 2, and 51 kW to 75 kW for tender 3. The project is estimated to cost Rs 687.4 million (tender 1), Rs 355.7 million (tender 2), Rs 173.8 million (tender 3).

According to the tender guidelines, the bidders are required to submit earnest money deposit equivalent to 2 per cent of the estimated contract value. The developers are required to furnish performance security equal to 5 per cent of the estimated contract value. The winning bidders must be responsible for maintenance for a period of five years. The bid submission deadline is July 24, 2024. The developers are required to deploy the systems within four months of work order issuance.

RELATED POSTS

Vikram Solar Bags 336 MW Module Supply Order from L&T for Khavda Project

Shweta Solar set to unveil 1.2 GW Advanced Solar Module Manufacturing Facility in NCR

Tags: Renewable EnergySecuritysolarUPNEDA
ShareTweetShare
editor

editor

Related Posts

Vikram Solar

Vikram Solar Bags 336 MW Module Supply Order from L&T for Khavda Project

by Palak
September 8, 2025
0

Kolkata – Vikram Solar has announced a major order win of 336 MW high-efficiency solar modules from L&T Construction. These...

Shweta Solar

Shweta Solar set to unveil 1.2 GW Advanced Solar Module Manufacturing Facility in NCR

by Palak
September 5, 2025
0

New Delhi : Shweta Solar Pvt. Ltd. (Shweta Solar) is all set to launch a new 1.2 GW solar module manufacturing...

IGL and RVUNL

IGL and RVUNL Forge Joint Venture for Rajasthan Solar Farms

by Palak
September 3, 2025
0

Indraprastha Gas Limited (IGL) and Rajasthan Rajya Vidyut Utpadan Nigam Limited (RVUNL) have inked a joint venture (JV) agreement to...

Premier Energies

Premier Energies Bags ₹27.03 Billion Orders for Solar Modules and Cells

by Palak
September 2, 2025
0

Premier Energies Limited has secured orders worth Rs 27.03 billion for the supply of solar photovoltaic modules and cells with...

GH2 Solar

GH2 Solar, AHES to Establish Electrolyser Manufacturing Facility in Madhya Pradesh

by Palak
September 2, 2025
0

GH2 Solar Limited, in a joint venture with Advanced Hydrogen Energy Solutions (AHES) Limited, will set up an electrolyser manufacturing...

Next Post
SECI Solar

SECI Invites Bids for 7.5 MW Solar Project

ACEN Renewables International Pte. Ltd.,

ACEN Secures $150 Million Five-Year Syndicated Green Term Loan

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Mr. Raman Bhatia with Jerry Nie Sino Zhuhai Piwin New Energy Co., Ltd

Servotech Renewable Power Partners with Zhuhai Piwin New Energy in Exclusive Deal

September 8, 2025
Vikram Solar

Vikram Solar Bags 336 MW Module Supply Order from L&T for Khavda Project

September 8, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Servotech Renewable Power Partners with Zhuhai Piwin New Energy in Exclusive Deal

Vikram Solar Bags 336 MW Module Supply Order from L&T for Khavda Project

What Are the Latest Technological Innovations in Fuel Cell Vehicles?

Shweta Solar set to unveil 1.2 GW Advanced Solar Module Manufacturing Facility in NCR

Transmission Lines: Myths, Facts, and Why They Matter for Powering India’s Future

UAE Energy Undersecretary Visits Tellus Power Globe Holding’s Hong Kong Office

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved