Suzlon secures 30 MW order for 3 MW series from EDF Renewables

0
391

Suzlon Group has secured a new order for the development of a 30 MW wind power project for EDF Renewables.

Suzlon will install  10  wind  turbine  generators  with a  hybrid  lattice tubular  tower  and a  rated  capacity of 3 MW each. The project is located in Gujarat. This is a repeat order  for the company’s largest turbine series, S144‐140m with a rating of 3 MW. Suzlon  will  execute  the  project  with  a  scope  of  supply,  supervision,  erection  and  commissioning. Additionally, Suzlon will also undertake post‐commissioning operations and maintenance services. The electricity generated from the project will be supplied to Gujarat Urja Vikas Nigam Limited.

Previous articleKP Energy commissions 25.2 MW ISTS-connected wind project in Sidhpur
Next articleBekaert, Toshiba partner on PEM electrolyser technology

LEAVE A REPLY

Please enter your comment!
Please enter your name here