NTPC Limited has commissioned 193 MW out of the 245 MW capacity at plot-3 of its Nokh solar photovoltaic (PV) project (3×245 MW) in Rajasthan.
The project achieved commercial operation on June 9, 2025. With this, NTPC’s total installed and commercial capacity now stands at 59,606 MW and 80,708 MW respectively, on a standalone and group basis.