Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Wind

GE Vernova announces 2.4 GW order for Pattern Energy’s SunZia wind project

editor by editor
January 11, 2024
in Wind
Reading Time: 3 mins read
0
GE Vernova
Share on FacebookShare on TwitterShare on Linkedin

Schenectady, New York – GE Vernova’s Onshore Wind business announced a new equipment and long-term services deal with Pattern Energy to supply 674 3.6-1541 wind turbines that will provide more than 2.4 gigawatts (GW) of power at the SunZia Wind project in New Mexico.

SunZia Wind, which is expected to be the largest wind project in the Western Hemisphere at over 3.5 GW total project size, will bring GE Vernova’s installed base with Pattern Energy in North America to approximately 4.3 GW upon completion. The order, which was received in the fourth quarter of 2023, is the largest single onshore wind turbine order ever received by GE Vernova, both in terms of quantity of turbines and gigawatts of power generation, upon completion.

RELATED POSTS

AGEL Commissions Solar-Wind Hybrid Project in Khavda

EIFO Commits £500 Million Financing for UK Offshore Wind Project

Scott Strazik, CEO of GE Vernova, said, “We are pleased to support Pattern Energy on this monumental project that reinforces the key role wind power has in delivering renewable energy to meet the growing demand for power in the Western U.S. and in accelerating the energy transition. The project is a great example of how the policy certainty created by the IRA is helping to drive significant investments in the U.S. wind power market. I want to congratulate our teams across GE Vernova for all the work that has and will go into bringing a project of this scale and magnitude to life.”

Vic Abate, Chief Technology Officer, GE and CEO, GE Vernova’s Wind business, said, “This project demonstrates GE Vernova’s ability to deliver on our workhorse strategy in Onshore Wind – producing fewer variants in large quantities at scale to drive quality and reliability across the fleet for our customers. We are proud to partner with our customer, Pattern Energy, on this historic project that will deliver the critical renewable energy required to meet the growing demand for power in the Western U.S.”

The 3.6-154 turbine is one of GE’s next generation workhorse products. Designed specifically for the U.S., the 3.6-154 delivers the highest efficiency in the market, with an optimized size for ease of logistics and installation. The 3.6-154 is built on the back of the 2.8-127 – the #1 turbine in the world over the last two years, according to the Woodmac 2022 OEM report, with more than 200 million operating hours of experience. The result of three years of research and development, this product is expected to bring recent innovations in turbine and blade design, including the digital blade certificate, an AI-trained blade manufacturing process designed to produce industry leading quality. The 3.6-154 launches as the most tested and validated turbine in GE’s history – a robust turbine to power the domestic energy transition.

GE Vernova and Pattern Energy’s collaboration on SunZia spans the last 18 months and includes collaborative development and supply chain work to optimize site layouts and performance while minimizing unnecessary variants – following GE Vernova’s workhorse philosophy.

“We are proud to expand on our mutual installed base with GE in North America to more than 4 GW,” said Hunter Armistead, CEO of Pattern Energy. “From the beginning this was a truly collaborative approach with GE to design an optimal site that maximizes turbine performance and optimizes fleet consistency. Nacelles and towers for the GE turbine are being domestically produced right here in the United States, helping SunZia create thousands of new jobs in manufacturing and construction. We’re proud to be building this milestone project together with GE that will bring clean energy to 3 million Americans.”

The project will be supplied through GE Vernova’s nacelle facility in Pensacola, Florida, as well as tower manufacturing facilities in Belen, New Mexico, Pueblo, Colorado, and Amarillo, Texas, reinforcing GE Vernova’s focus on taking full advantage of the Inflation Reduction Act to revitalize and enhance American manufacturing. GE Vernova announced in May of 2023 that it plans to invest $50 million and add 200 additional union jobs as part of creating a new manufacturing assembly line for its Onshore Wind business in Schenectady, New York, and announced that the first turbine was produced by that facility in November of 2023.

Abate said, “Mega projects like SunZia, coupled with the IRA, are enabling our continued investments in wind technology, domestic manufacturing, and product quality. These investments are aiding the country’s efforts to decarbonize the electric grid in support of climate change goals.”

In support of this wind turbine mega deal, GE Vernova was able to provide Pattern Energy with both high tech Consulting Services, and Financial Services that contributed to the project’s launch.

GE Vernova’s 3.6-154 turbine is one of several workhorse products that bring together focused design, efficient supply, reduced complexity, improved reliability, and bankability to offer best-in-class products. GE Vernova’s Onshore Wind business has been the number one provider of onshore wind turbine installs in the U.S. for the last five years according to the American Clean Power Association, and currently has a fleet of more than 55,000 wind turbines installed around the world.

1 – GE’s 3.6 MW turbine with a 154-meter rotor is what we refer to as the 3.6-154.

Tags: Consulting ServicesEnergyFinancial ServicesGE VernovaInnovationsIRASunZia WindWind Power
ShareTweetShare
editor

editor

Related Posts

AGEL

AGEL Commissions Solar-Wind Hybrid Project in Khavda

by Palak
August 11, 2025
0

Adani Green Energy Limited’s (AGEL) subsidiary, Adani Renewable Energy Three Limited, has commissioned a 50 MW solar-wind hybrid power project...

EIFO

EIFO Commits £500 Million Financing for UK Offshore Wind Project

by Palak
August 8, 2025
0

The Export and Investment Fund of Denmark (EIFO) has provided a £500 million project finance guarantee for the East Anglia...

Gentari

Gentari Inks PPA with AWS for 80 MW Wind Project

by Palak
August 7, 2025
0

Gentari and Amazon Web Services (AWS) have signed a power purchase agreement (PPA) for a 80 MW wind power project...

EU Greenlight

EU Greenlights €11 Billion French Offshore Wind Support Scheme

by Palak
August 7, 2025
0

The European Commission has approved an €11 billion French State aid scheme to support offshore wind energy under the Clean...

Juniper Green Energy

Juniper Green Energy Commissions 25 MW Wind Project in Gujarat

by Palak
August 6, 2025
0

Juniper Green Energy Limited has commissioned the 25 MW wind power capacity at Dev Bhumi Dwarka, Gujarat as part of...

Next Post
Nordex Group receives orders for 122 MW from Denker & Wulf AG in Germany

Nordex Group receives orders for 122 MW from Denker & Wulf AG in Germany

Mahindra Introduces the All-Electric XUV400 Pro Range

Mahindra Introduces the All-Electric XUV400 Pro Range

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

SWERL

SWERL Wins EPC Contract from NTPC REL for 245 MW Solar Project

August 18, 2025
EV Adhesives Market

EV Adhesives Market Enabling Safer, Faster, and Smarter Electric Mobility

August 18, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

SWERL Wins EPC Contract from NTPC REL for 245 MW Solar Project

EV Adhesives Market Enabling Safer, Faster, and Smarter Electric Mobility

Offshore Wind Turbine Efficiency Market Projected to Hit $18.7 Billion by 2033

Innovations Driving Growth in the Fire Pump Market

VinFast’s Rapid EV Expansion in Tamil Nadu Highlights Bold Growth Ambitions

Eastman Unveils SolarLink Grid-Tie Inverter Range to Boost Energy Independence

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved