Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Power

CEA Releases Guidelines to Verify Captive Power Plant Status

Palak by Palak
February 14, 2025
in Power
Reading Time: 1 min read
0
Central Electricity Authority
Share on FacebookShare on TwitterShare on Linkedin

The Central Electricity Authority (CEA) has issued new guidelines for verifying the captive status of generating plants where power producers and their users are located in more than one state.

The guidelines have been introduced under the Electricity Rules, 2005, with the approval of the central government. They mandate an annual verification process for captive generating plants  and their users, requiring applications to be submitted by May 31st each year. Applicants must provide affidavits and detailed data on electricity generation, user-wise consumption, and equity shareholding. In the case of group captive setups, plant owners must ensure only eligible users are included. The verification process will be completed within two months of receiving a complete application. Additional provisions apply to multiple generating plants sharing a single grid interface, requiring separate applications, affidavits from plant owners, and authentication of total energy generation by relevant authorities.

RELATED POSTS

Hitachi Energy Wins Order to Supply 765 kV Transformers to Powergrid

NTPC Begins Operations of 660 MW Unit at Barh Super Thermal Power Plant in Bihar

Tags: CEAElectricitygovernmentpowerRenewable Energy
ShareTweetShare
Palak

Palak

Related Posts

Hitachi Energy

Hitachi Energy Wins Order to Supply 765 kV Transformers to Powergrid

by Palak
June 30, 2025
0

Hitachi Energy India Limited has secured an order from Power Grid Corporation of India Limited (Powergrid) for the supply of...

NTPC

NTPC Begins Operations of 660 MW Unit at Barh Super Thermal Power Plant in Bihar

by Palak
June 30, 2025
0

NTPC Limited has commenced operations of Unit #3 (660 MW) of the Barh super thermal power project (TPP), stage-I (3×660...

THDC

THDC Inks Deals for 184.08 MW Green Power Supply from Tehri PSP

by Palak
June 28, 2025
0

THDC India Limited has signed a MoU and power purchase agreement with the Government of Gujarat and Gujarat Urja Vikas...

NSE Waives

NSE Waives Transaction Charges on Electricity Futures Until December 2025

by Palak
June 28, 2025
0

Reportedly, the National Stock Exchange (NSE) will waive transaction charges on electricity futures contracts until December 31, 2025 to promote...

Rajesh Power

Rajesh Power Services Wins ₹597.9 Million Power Supply Contract for GIFT City

by Palak
June 21, 2025
0

Rajesh Power Services Limited has received an order from GIFT Power Company Limited for developing distribution and backup power systems...

Next Post
WestWind Energy

WestWind Energy to Develop 1 GW Wind Project in Australia

ONGPL

ONGPL Acquires Ayana Renewable Power in 100% Stake Deal

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Hitachi Energy

Hitachi Energy Wins Order to Supply 765 kV Transformers to Powergrid

June 30, 2025
NTPC

NTPC Begins Operations of 660 MW Unit at Barh Super Thermal Power Plant in Bihar

June 30, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Hitachi Energy Wins Order to Supply 765 kV Transformers to Powergrid

NTPC Begins Operations of 660 MW Unit at Barh Super Thermal Power Plant in Bihar

THDC Inks Deals for 184.08 MW Green Power Supply from Tehri PSP

World Bank and IAEA Ink Pact to Promote Safe Nuclear Energy in Developing Nations

Toyota Kirloskar Motor Partners with Ohmium to Advance Green Hydrogen Solutions in India

NSE Waives Transaction Charges on Electricity Futures Until December 2025

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved