Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

Delta Supplies High-Efficiency PV Inverters for Southern Germany’s Largest Ground-mounted Solar Plant

Urja Daily by Urja Daily
December 15, 2020
in News
Reading Time: 3 mins read
0
Delta Supplies High-Efficiency PV Inverters for Southern Germany’s Largest Ground-mounted Solar Plant
Share on FacebookShare on TwitterShare on Linkedin

Delta has announced it is providing its high-efficiency PV string inverters M70A series to the solar company Anumar, an engineering, procurement and construction (EPC) services provider, which is building the Solarpark Schornhof project, currently the largest ground-mounted solar park in Southern Germany. The M70A inverters’ compliance with the new VDE Technical Connection Rules for High-Voltage (VDE-AR-N 4120) was a crucial factor for Anumar’s decision to select Delta for this project. The project aims to cut CO2 emissions by up to 77,000 tonnes per year with an output of 120 MWp. To date, approximately one third of the circa 1,500 Delta M70A string PV inverters the project requires have been deployed at the solar park.  

Commenting on the deployment, Markus Brosch, CEO of Anumar explained: “At such a large project like Solarpark Schornhof, it was particularly important for us to have a trusted partner who is able to respond rapidly to our needs. We have been installing equipment made by Delta for many years and already have several solar power projects under our belts in partnership with them. Throughout those projects, Delta has always provided us with fast and easy to access support.”

RELATED POSTS

StayVista Raises Over INR 40 Cr in Funding Round Led by JSW Ventures

EIA Data Reveals Record-Breaking Renewable Energy Generation in April

Andreas Hoischen, senior director of Photovoltaic Inverters Business Unit, Delta EMEA, added: “Thanks to its compact design combined with high power density, our M70A inverter is easy to transport and install, and is particularly well suited to use in large, ground-mounted, commercial solar power plants such as the one we have here in Schornhof.”

Anumar selected Delta’s M70A String Inverters because they met the requirement to comply with the new VDE Technical Connection Rules for High-Voltage, which is a basic prerequisite for connecting the plant to the high voltage grid. In total, Delta will provide approximately 1,500 inverters required to fulfil the site’s needs, and the first panels – producing 70 MW of power – have been recently attached to the grid. With peak output of 120 MWp, the solar plant is expected to generate 110 million kWh of electricity every year.

One of the challenges faced, was how best to create a solar park with as little ecological impact as possible. Only half of the 150-hectare site will be covered with solar modules. The remaining 70 hectares will be transformed into a ‘green haven’ to encourage biodiversity by the operator. This part of the project entails planting some 50,000 new shrubs and trees, with the existing perimeter woods being retained.

The energy conversion from the solar modules to the feed-in point in the high-voltage grid is carried out in three stages. In the first stage, the solar energy from up to 12 module strings – which corresponds to a maximum of 70 kW – is combined into one inverter, where it is converted to 400 VAC AC voltage. In the next stage, the energy from up to 30 inverters is then transferred to one of the 60 or more transformers that raise the voltage level to 20 kV. From the transformers, the energy is transferred to the substation built especially for the solar park. Finally, the voltage level is raised to 110 kV, so that the energy can be fed into the high-voltage transmission network that runs past the solar park. The electricity generated from Solarpark Schornhof is sufficient to power up to 30,000 households, which is equivalent to the entire Neuburg-Schrobenhausen rural district.

Anumar chose solutions from Delta because, for many years, the two companies have successfully completed several solar power projects together. During those projects, Delta has always impressed Anumar with its exceptional product knowledge and industry expertise, which has helped to build a long-standing, personal, and loyal partnership between the two companies.

The Solarpark Schornhof project, located in the Neuburg-Schrobenhausen district to the southwest of Ingolstadt, is scheduled for completion by the end of the first quarter of 2021. It is financed based on 90 MW power purchase agreements (PPA) and funding under the German Renewable Energy Sources Act (EEG).

Tags: DeltaHigh-EfficiencyPV Inverterssolar power plant
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

JSW Ventures

StayVista Raises Over INR 40 Cr in Funding Round Led by JSW Ventures

by Palak
June 27, 2025
0

Mumbai (India) : StayVista has raised over INR 40 Cr in Series B funding, led by JSW Ventures, with participation...

EIA Data

EIA Data Reveals Record-Breaking Renewable Energy Generation in April

by Palak
June 27, 2025
0

Washington DC – A review by the SUN DAY Campaign of data just released by the U.S. Energy Information Administration (EIA)...

Sustain Labs Paris

Sustain Labs Paris Unveils 2025 Climate Leaders Cohort with 47% Indian Representation

by Palak
June 27, 2025
0

Delhi : Sustain Labs Paris (SLP), the world’s largest sustainability-focused venture builder, has unveiled the 2025 cohort of its prestigious Climate...

THDCIL

THDCIL to Supply 184.08 MW Clean Power to Gujarat from Tehri PSP

by Palak
June 27, 2025
0

For the supply of 184.08 MW clean power from India’s first Variable Speed Tehri PSP in Uttarakhand The agreement is...

Automotive Skills Development Council

PLI, EVs, and Skill Development Key to India’s Auto Future: Dr. Qureshi at ASDC Event

by Palak
June 25, 2025
0

New Delhi : Automotive Skills Development Council (ASDC) successfully hosted its Annual Partners Forum 2025 at The Grand Hotel, New Delhi,...

Next Post
Lithium-ion Battery Recycling-1

Li-Cycle Named to the Annual Global Cleantech 100

IDTechEx

Energy Storage Research:IDTechEx

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Philippines

Philippines Unveils Offshore Wind Roadmap to Boost Renewable Energy Development

June 27, 2025
Meta

Meta Signs EAPAs with Adapture Renewables for 360 MW Solar Project in Texas

June 27, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Philippines Unveils Offshore Wind Roadmap to Boost Renewable Energy Development

Meta Signs EAPAs with Adapture Renewables for 360 MW Solar Project in Texas

Bondada Engineering Establishes GreenBond RE Park to Accelerate Clean Energy Projects

METLEN and Jinko ESS Forge Energy Storage Partnership for Europe and Latin America

JSW Energy Inks PPA with NHPC for 300 MW Solar-Wind Hybrid Project

StayVista Raises Over INR 40 Cr in Funding Round Led by JSW Ventures

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved